ITAC Assessment: MS0041
ITAC logo
ITAC Assessment: MS0041
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Furniture
NAICS
n/a
SIC 2521: Wood Office Furniture
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 114,000
ft2
Annual Production 93,750
pieces
Production Hrs. Annual 2,250
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $62,597 812,427
kWh
Natural Gas $11,962 2,955
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,704 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $467

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $216 $742 $216
2,638
kWh
-
02 2.2437: Recover waste heat from equipment $404 $130 - $404
-
MMBtu
03 2.7111: Reduce illumination to minimum necessary levels $2,528 $450 $2,528
30,481
kWh
-
04 2.7261: Install timers and/or thermostats $251 $160 - $251
-
MMBtu
05 2.2414: Use waste heat from hot flue gases to preheat $1,305 $700 - $1,305
-
MMBtu
TOTAL RECOMMENDED $4,704 $2,182 $2,744
33,119
kWh
$1,960
-
MMBtu
TOTAL IMPLEMENTED $467 $902 $216
2,638
kWh
$251
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs