ITAC Assessment: DL0259
ITAC logo
ITAC Assessment: DL0259
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Oat based fluid milk
NAICS 311511: Fluid Milk Manufacturing
SIC 2026: Fluid Milk
Sales Range $100
M
to 500
M
# of Employees 40
Plant Area 50,000
ft2
Annual Production 13,209
Tgal
Production Hrs. Annual 6,240
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $621,879 5,162,563
kWh
Electricity Demand $58,354 18,940
kW-mo/yr
Electricity Fees $33,388 -
Natural Gas $243,950 22,867
MMBtu
TOTAL YEARLY COSTS $957,571
RECOMMENDED SAVINGS* $73,436 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 3.1191: Change procedures / equipment / operating conditions $45,458 $19,000 - - $45,458
-
MMBtu
02 2.2437: Recover waste heat from equipment $11,620 $30,000 - - $11,620
-
MMBtu
03 2.1243: Use heat from boiler blowdown to preheat boiler feed water $3,091 $13,000 - - $3,091
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,217 $5,500 $3,114
24,519
kWh
$104
-
kW-mo/yr
-
05 2.2424: Use heat in flue gases to preheat products or materials $10,050 $40,000 - - $10,050
-
MMBtu
TOTAL RECOMMENDED $73,436 $107,500 $3,114
24,519
kWh
$104
-
kW-mo/yr
$70,219
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs