523
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Ice cream and frozen desserts | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UF0640 #11 Y:2025 | 11 | 2025 | Improve space comfort conditioning | $31,352 | $6,210 |
n/a
|
| UF0640 #10 Y:2025 | 10 | 2025 | Install refrigeration system to cool product | $76,474 | $55,000 |
n/a
|
| UF0640 #09 Y:2025 | 09 | 2025 | Eliminate leaks in water lines and valves | $6,235 | $2,204 |
n/a
|
| UF0640 #08 Y:2025 | 08 | 2025 | Meter recycled water (to reduce sewer charges) | $40,788 | $5,352 |
n/a
|
| UF0640 #07 Y:2025 | 07 | 2025 | Install turbulators | $747 | $3,000 |
n/a
|
| UF0640 #06 Y:2025 | 06 | 2025 | Improve combustion control capability | $868 | $1,400 |
n/a
|
| UF0640 #05 Y:2025 | 05 | 2025 | Increase amount of condensate returned | $1,007 | $1,670 |
n/a
|
| UF0640 #04 Y:2025 | 04 | 2025 | Utilize energy-efficient belts and other improved mechanisms | $1,691 | - |
n/a
|
| UF0640 #03 Y:2025 | 03 | 2025 | Reduce the pressure of compressed air to the minimum required | $1,993 | - |
n/a
|
| UF0640 #02 Y:2025 | 02 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $4,193 | $360 |
n/a
|
| UF0640 #01 Y:2025 | 01 | 2025 | Use demand controller or load shedder | $13,290 | $8,730 |
n/a
|
| NL0099 #06 Y:2024 | 06 | 2024 | Change rate schedules or other changes in utility service | $240 | $35 |
n/a
|
| NL0099 #05 Y:2024 | 05 | 2024 | Eliminate or reduce compressed air usage | $6,201 | $140 |
n/a
|
| NL0099 #04 Y:2024 | 04 | 2024 | Use flue gases to heat process or service water | $8,784 | $35,100 |
n/a
|
| NL0099 #03 Y:2024 | 03 | 2024 | Use waste heat from hot flue gases to preheat | $102,668 | $214,595 |
n/a
|
| NL0099 #02 Y:2024 | 02 | 2024 | Optimize plant power factor | $569,646 | $74,000 |
n/a
|
| NL0099 #01 Y:2024 | 01 | 2024 | Replace existing chiller with high efficiency model | $3,986,937 | $49,000,000 |
n/a
|
| CI0032 #09 Y:2024 | 09 | 2024 | Use most efficient type of electric motors | $454 | $1,050 | |
| CI0032 #08 Y:2024 | 08 | 2024 | Install occupancy sensors | $1,100 | $2,025 | |
| CI0032 #07 Y:2024 | 07 | 2024 | Recharge batteries on during off-peak demand periods | $1,346 | $100 |