Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

523

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Ice cream and frozen desserts
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UF0640 #11 Y:2025 Improve space comfort conditioning $31,352 $6,210
UF0640 #10 Y:2025 Install refrigeration system to cool product $76,474 $55,000
UF0640 #09 Y:2025 Eliminate leaks in water lines and valves $6,235 $2,204
UF0640 #08 Y:2025 Meter recycled water (to reduce sewer charges) $40,788 $5,352
UF0640 #07 Y:2025 Install turbulators $747 $3,000
UF0640 #06 Y:2025 Improve combustion control capability $868 $1,400
UF0640 #05 Y:2025 Increase amount of condensate returned $1,007 $1,670
UF0640 #04 Y:2025 Utilize energy-efficient belts and other improved mechanisms $1,691 -
UF0640 #03 Y:2025 Reduce the pressure of compressed air to the minimum required $1,993 -
UF0640 #02 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $4,193 $360
UF0640 #01 Y:2025 Use demand controller or load shedder $13,290 $8,730
NL0099 #06 Y:2024 Change rate schedules or other changes in utility service $240 $35
NL0099 #05 Y:2024 Eliminate or reduce compressed air usage $6,201 $140
NL0099 #04 Y:2024 Use flue gases to heat process or service water $8,784 $35,100
NL0099 #03 Y:2024 Use waste heat from hot flue gases to preheat $102,668 $214,595
NL0099 #02 Y:2024 Optimize plant power factor $569,646 $74,000
NL0099 #01 Y:2024 Replace existing chiller with high efficiency model $3,986,937 $49,000,000
CI0032 #09 Y:2024 Use most efficient type of electric motors $454 $1,050
CI0032 #08 Y:2024 Install occupancy sensors $1,100 $2,025
CI0032 #07 Y:2024 Recharge batteries on during off-peak demand periods $1,346 $100