278
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | 3+ Digits Required | |
SIC | Dry, condensed, and evaporated dairy products | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
SF0621 #12 Y:2024 | 12 | 2024 | Use solar heat to make electricty | $238,787 | $1,065,639 |
n/a
|
SF0621 #11 Y:2024 | 11 | 2024 | Use heat from boiler blowdown to preheat boiler feed water | $9,426 | $15,810 |
n/a
|
SF0621 #10 Y:2024 | 10 | 2024 | Install isolation transformer on adjustable frequency drive | $26,726 | $23,394 |
n/a
|
SF0621 #09 Y:2024 | 09 | 2024 | Insulate bare equipment | $17,564 | $9,294 |
n/a
|
SF0621 #08 Y:2024 | 08 | 2024 | Eliminate or reduce compressed air usage | $6,248 | $2,796 |
n/a
|
SF0621 #07 Y:2024 | 07 | 2024 | Use flow control valves on equipment to optimize water use | $6,048 | $1,839 |
n/a
|
SF0621 #06 Y:2024 | 06 | 2024 | Increase amount of condensate returned | $335,892 | $109,275 |
n/a
|
SF0621 #05 Y:2024 | 05 | 2024 | Install steam trap | $9,822 | $1,988 |
n/a
|
SF0621 #04 Y:2024 | 04 | 2024 | Eliminate leaks in water lines and valves | $7,560 | $700 |
n/a
|
SF0621 #03 Y:2024 | 03 | 2024 | Repair or replace steam traps | $6,435 | $478 |
n/a
|
SF0621 #02 Y:2024 | 02 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $4,882 | - |
n/a
|
SF0621 #01 Y:2024 | 01 | 2024 | Reduce the pressure of compressed air to the minimum required | $12,755 | $300 |
n/a
|
UW2205 #03 Y:2022 | 03 | 2022 | Use most efficient type of electric motors | $3,984 | $15,999 | |
UW2205 #02 Y:2022 | 02 | 2022 | Insulate glazing, walls, ceilings, and roofs | $169 | $838 | |
UW2205 #01 Y:2022 | 01 | 2022 | Utilize higher efficiency lamps and/or ballasts | $4,244 | $12,938 | |
AS0498 #05 Y:2020 | 05 | 2020 | Install occupancy sensors | $2,328 | $1,452 | |
AS0498 #04 Y:2020 | 04 | 2020 | Make ice during off peak hours for cooling | $4,426 | $15,525 | |
AS0498 #03 Y:2020 | 03 | 2020 | Contract a wood pallet recycling company | $5,616 | $453 | |
AS0498 #02 Y:2020 | 02 | 2020 | Utilize higher efficiency lamps and/or ballasts | $10,073 | $11,543 | |
AS0498 #01 Y:2020 | 01 | 2020 | Combine utility meters | $25,997 | $1,473 |