ITAC Assessment: AS0498
ITAC logo
ITAC Assessment: AS0498
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Dried Colostrum
NAICS 311514: Dry, Condensed, and Evaporated Dairy Product Manufacturing
SIC 2023: Dry, Condensed, and Evaporated Dairy Products
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 87,000
ft2
Annual Production 1
units
Production Hrs. Annual 8,760
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $181,032 4,011,600
kWh
Electricity Demand $200,288 10,308
kW-mo/yr
Electricity Fees $41,520 -
Natural Gas $165,725 44,549
MMBtu
Waste Disposal Costs
Water Usage $108,724 12,741
Tgal
Water Disposal $120,085 11,722
Tgal
TOTAL YEARLY COSTS $817,374
RECOMMENDED SAVINGS* $48,440 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $48,440

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 2.8112: Combine utility meters $25,997 $1,473 $(-33,107.0)
-
kWh
$57,673
-
kW-mo/yr
$1,431 - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $10,073 $11,543 $5,712
128,083
kWh
$3,396
-
kW-mo/yr
- - $965
03 3.5316: Contract a wood pallet recycling company $5,616 $453 - - - $5,616 -
04 2.3113: Make ice during off peak hours for cooling $4,426 $15,525 $(-79.0)
(-1,778)
kWh
$4,505
-
kW-mo/yr
- - -
05 2.7135: Install occupancy sensors $2,328 $1,452 $2,328
52,191
kWh
- - - -
TOTAL RECOMMENDED $48,440 $30,446 $(-25,146.0)
178,496
kWh
$65,574
-
kW-mo/yr
$1,431 $5,616 $965
TOTAL IMPLEMENTED $48,440 $30,446 $(-25,146.0)
178,496
kWh
$65,574
-
kW-mo/yr
$1,431 $5,616 $965
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs