ITAC Assessment: AM0374
ITAC logo
ITAC Assessment: AM0374
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Precision sheet metal work
NAICS
n/a
SIC 3444: Sheet Metal Work
Sales Range $5
M
to 10
M
# of Employees 102
Plant Area 57,000
ft2
Annual Production 1,860,000
lb
Production Hrs. Annual 4,932
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $47,550 1,496,776
kWh
Electricity Demand $52,940 3,948
kW-mo/yr
Natural Gas $7,306 1,522
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,670 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,410

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 2.4239: Eliminate or reduce compressed air usage $2,510 $350 $2,510
78,546
kWh
- -
02 2.7111: Reduce illumination to minimum necessary levels $1,670 $910 $830
26,084
kWh
$840
-
kW-mo/yr
-
03 2.7124: Make a practice of turning off lights when not needed $1,080 - $480
15,240
kWh
$600
-
kW-mo/yr
-
04 4.652: Replace existing equipment with more suitable substitutes $1,010 $610 $115
3,517
kWh
$65
-
kW-mo/yr
$830
05 2.4231: Reduce the pressure of compressed air to the minimum required $930 $78 $460
14,361
kWh
$470
-
kW-mo/yr
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $470 $155 $470
14,654
kWh
- -
TOTAL RECOMMENDED $7,670 $2,103 $4,865
152,402
kWh
$1,975
-
kW-mo/yr
$830
TOTAL IMPLEMENTED $2,410 $843 $1,045
32,532
kWh
$535
-
kW-mo/yr
$830
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs