| Assessment Year | 2000 |
|---|---|
| Principal Product | Precision sheet metal work |
| NAICS |
n/a
|
| SIC | 3444: Sheet Metal Work |
| Sales Range | $5 M to 10M |
| # of Employees | 102 |
| Plant Area |
57,000
ft2
|
| Annual Production | 1,860,000
lb
|
| Production Hrs. Annual | 4,932
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $47,550 | 1,496,776 |
kWh
|
$0.032 |
| Electricity Demand | $52,940 | 3,948 |
kW-mo/yr
|
$13.41 |
| Natural Gas | $7,306 | 1,522 |
MMBtu
|
$4.80 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $7,670 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $2,410 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4239: Eliminate or reduce compressed air usage | $2,510 | $350 |
$2,510
78,546
kWh
|
- | - | |
| 02 | 2.7111: Reduce illumination to minimum necessary levels | $1,670 | $910 |
$830
26,084
kWh
|
$840
-
kW-mo/yr
|
- | |
| 03 | 2.7124: Make a practice of turning off lights when not needed | $1,080 | - |
$480
15,240
kWh
|
$600
-
kW-mo/yr
|
- | |
| 04 | 4.652: Replace existing equipment with more suitable substitutes | $1,010 | $610 |
$115
3,517
kWh
|
$65
-
kW-mo/yr
|
$830 | |
| 05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $930 | $78 |
$460
14,361
kWh
|
$470
-
kW-mo/yr
|
- | |
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $470 | $155 |
$470
14,654
kWh
|
- | - | |
| TOTAL RECOMMENDED | $7,670 | $2,103 |
$4,865
152,402
kWh
|
$1,975
-
kW-mo/yr
|
$830 | ||
| TOTAL IMPLEMENTED | $2,410 | $843 |
$1,045
32,532
kWh
|
$535
-
kW-mo/yr
|
$830 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs