Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,806

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Dairy products
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
DL0259 #05 Y:2025 Use heat in flue gases to preheat products or materials $10,050 $40,000
DL0259 #04 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $3,217 $5,500
DL0259 #03 Y:2025 Use heat from boiler blowdown to preheat boiler feed water $3,091 $13,000
DL0259 #02 Y:2025 Recover waste heat from equipment $11,620 $30,000
DL0259 #01 Y:2025 Change procedures / equipment / operating conditions $45,458 $19,000
CI0042 #10 Y:2024 Recharge batteries on during off-peak demand periods $2,862 $6,000
CI0042 #09 Y:2024 Install compressor air intakes in coolest locations $4,050 $6,000
CI0042 #08 Y:2024 Utilize higher efficiency lamps and/or ballasts $4,561 $4,560
CI0042 #07 Y:2024 Install occupancy sensors $8,210 $2,325
CI0042 #06 Y:2024 Use most efficient type of electric motors $16,424 $4,950
CI0042 #05 Y:2024 Replace existing hvac unit with high efficiency model $17,797 $90,000
CI0042 #04 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $33,610 $14,000
CI0042 #03 Y:2024 Replace existing chiller with high efficiency model $44,001 $25,000
CI0042 #02 Y:2024 Replace boiler $66,255 $50,000
CI0042 #01 Y:2024 Use solar heat to make electricty $99,111 $675,274
WM0234 #06 Y:2024 Lower temperature during the winter season and vice-versa $1,418 -
WM0234 #05 Y:2024 Reduce the pressure of compressed air to the minimum required $3,221 -
WM0234 #04 Y:2024 Install compressor air intakes in coolest locations $3,502 $10,895
WM0234 #03 Y:2024 Install occupancy sensors $5,023 $279
WM0234 #02 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $5,917 $2,750