Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

789

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Meat packing plants
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LE0416 #15 Y:2016 Use / purchase optimum sized compressor $19,802 $88,000
LE0416 #14 Y:2016 Utilize higher efficiency lamps and/or ballasts $23,762 $103,000
LE0416 #13 Y:2016 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $302,516 $1,300,000
LE0416 #12 Y:2016 Utilize higher efficiency lamps and/or ballasts $1,521 $4,533
LE0416 #11 Y:2016 Preheat boiler makeup water with waste process heat $32,117 $87,100
LE0416 #10 Y:2016 Eliminate leaks in inert gas and compressed air lines/ valves $3,177 $6,325
LE0416 #09 Y:2016 Use adjustable frequency drive or multiple speed motors on existing system $20,545 $31,000
LE0416 #08 Y:2016 Use adjustable frequency drive or multiple speed motors on existing system $24,266 $33,000
LE0416 #07 Y:2016 Eliminate or reduce compressed air usage $82,969 $110,000
LE0416 #06 Y:2016 Use adjustable frequency drive or multiple speed motors on existing system $85,792 $97,000
LE0416 #05 Y:2016 Eliminate or reduce compressed air usage $10,285 $11,000
LE0416 #04 Y:2016 Eliminate or reduce compressed air usage $18,534 $19,000
LE0416 #03 Y:2016 Use adjustable frequency drive or multiple speed motors on existing system $10,060 $4,550
LE0416 #02 Y:2016 Use optimum size and capacity equipment $22,973 $9,000
LE0416 #01 Y:2016 Eliminate leaks in inert gas and compressed air lines/ valves $43,389 $1,000
UD0899 #11 Y:2013 Utilize higher efficiency lamps and/or ballasts $2,635 $3,920
UD0899 #10 Y:2013 Utilize higher efficiency lamps and/or ballasts $3,255 $5,850
UD0899 #09 Y:2013 Utilize higher efficiency lamps and/or ballasts $5,254 $15,180
UD0899 #08 Y:2013 Use adjustable frequency drive or multiple speed motors on existing system $969 $2,127
UD0899 #07 Y:2013 Use adjustable frequency drive or multiple speed motors on existing system $9,350 $7,126