ITAC Assessment: LE0416
ITAC logo
ITAC Assessment: LE0416
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Beef Products
NAICS 311611: Animal (except Poultry) Slaughtering
SIC 2011: Meat Packing Plants
Sales Range $100
M
to 500
M
# of Employees 100
Plant Area 240,000
ft2
Annual Production 200,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,738,600 36,713,584
kWh
Electricity Demand $405,370 78,095
kW-mo/yr
Electricity Fees $207,024 -
Natural Gas $599,122 254,643
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $702,411 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $154,378

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $43,389 $1,000 $37,675
801,598
kWh
$5,714
-
kW-mo/yr
- -
02 2.4323: Use optimum size and capacity equipment $22,973 $9,000 $22,973
488,779
kWh
- - -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $10,060 $4,550 $8,679
184,670
kWh
$1,381
-
kW-mo/yr
- -
04 2.4239: Eliminate or reduce compressed air usage $18,534 $19,000 $14,646
311,625
kWh
$3,887
-
kW-mo/yr
- -
05 2.4239: Eliminate or reduce compressed air usage $10,285 $11,000 $8,131
173,004
kWh
$2,154
-
kW-mo/yr
- -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $85,792 $97,000 $72,895
1,550,950
kWh
$12,897
-
kW-mo/yr
- -
07 2.4239: Eliminate or reduce compressed air usage $82,969 $110,000 $65,572
1,395,146
kWh
$17,397
-
kW-mo/yr
- -
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $24,266 $33,000 $20,617
438,669
kWh
$3,649
-
kW-mo/yr
- -
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $20,545 $31,000 $17,742
377,497
kWh
$2,803
-
kW-mo/yr
- -
10 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,177 $6,325 $2,757
58,654
kWh
$420
-
kW-mo/yr
- -
11 2.2441: Preheat boiler makeup water with waste process heat $32,117 $87,100 - - $32,117
-
MMBtu
-
12 2.7142: Utilize higher efficiency lamps and/or ballasts $1,521 $4,533 $1,288
27,396
kWh
$197
-
kW-mo/yr
- $36
13 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $302,516 $1,300,000 $355,320
7,560,000
kWh
- $(-52,804.5)
-
MMBtu
-
14 2.7142: Utilize higher efficiency lamps and/or ballasts $23,762 $103,000 $20,632
438,984
kWh
$3,130
-
kW-mo/yr
- -
15 2.4226: Use / purchase optimum sized compressor $19,802 $88,000 $16,823
357,945
kWh
$2,979
-
kW-mo/yr
- -
16 2.7142: Utilize higher efficiency lamps and/or ballasts $704 $3,408 $465
9,898
kWh
$239
-
kW-mo/yr
- -
TOTAL RECOMMENDED $702,411 $1,907,916 $666,216
14,174,815
kWh
$56,846
-
kW-mo/yr
$(-20,687.1)
-
MMBtu
$36
TOTAL IMPLEMENTED $154,378 $114,941 $135,295
2,878,621
kWh
$19,047
-
kW-mo/yr
- $36
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings