Assessment Year | 1986 |
---|---|
Principal Product | SPUN CARPET YARN |
NAICS |
n/a
|
SIC | 2281: Yarn Spinning Mills |
Sales Range | $10 M to 50M |
# of Employees | 130 |
Plant Area |
n/a
|
Annual Production | 7,600,000
lb
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $491,621 | 9,842,908 |
kWh
|
$0.050 |
Natural Gas | $168,648 | 40,947 |
MMBtu
|
$4.12 |
Fuel Oil #2 | $5,673 | 1,589 |
MMBtu
|
$3.57 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $263,636 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings |
---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $2,170 | $2,356 |
$2,170
43,376
kWh
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $11,783 | $32,572 |
$11,783
235,639
kWh
|
- | - | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,882 | $2,790 |
$1,882
37,515
kWh
|
- | - | |
04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $10,257 | $1,000 | - |
$9,925
-
MMBtu
|
$332
-
MMBtu
|
|
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,970 | - |
$1,970
39,273
kWh
|
- | - | |
06 | 2.7226: Use computer programs to optimize hvac performance | $61,200 | $10,000 |
$61,200
1,224,209
kWh
|
- | - | |
07 | 2.4322: Use or replace with energy efficient substitutes | $37,018 | $91,200 | - |
$35,815
-
MMBtu
|
$1,203
-
MMBtu
|
|
08 | 2.4312: Improve lubrication practices | $10,261 | - |
$10,261
205,158
kWh
|
- | - | |
09 | 2.1333: Convert combustion equipment to burn oil | $127,095 | $28,000 | - |
$122,961
-
MMBtu
|
$4,134
-
MMBtu
|
|
TOTAL RECOMMENDED | $263,636 | $167,918 |
$89,266
1,785,170
kWh
|
$168,701
-
MMBtu
|
$5,669
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs