ITAC Assessment: GT0302
ITAC logo
ITAC Assessment: GT0302
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product SPUN CARPET YARN
NAICS
n/a
SIC 2281: Yarn Spinning Mills
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area
n/a
Annual Production 7,600,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $491,621 9,842,908
kWh
Natural Gas $168,648 40,947
MMBtu
Fuel Oil #2 $5,673 1,589
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $263,636 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
01 2.4133: Use most efficient type of electric motors $2,170 $2,356 $2,170
43,376
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $11,783 $32,572 $11,783
235,639
kWh
- -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,882 $2,790 $1,882
37,515
kWh
- -
04 2.1233: Analyze flue gas for proper air/fuel ratio $10,257 $1,000 - $9,925
-
MMBtu
$332
-
MMBtu
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,970 - $1,970
39,273
kWh
- -
06 2.7226: Use computer programs to optimize hvac performance $61,200 $10,000 $61,200
1,224,209
kWh
- -
07 2.4322: Use or replace with energy efficient substitutes $37,018 $91,200 - $35,815
-
MMBtu
$1,203
-
MMBtu
08 2.4312: Improve lubrication practices $10,261 - $10,261
205,158
kWh
- -
09 2.1333: Convert combustion equipment to burn oil $127,095 $28,000 - $122,961
-
MMBtu
$4,134
-
MMBtu
TOTAL RECOMMENDED $263,636 $167,918 $89,266
1,785,170
kWh
$168,701
-
MMBtu
$5,669
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs