35
matching recommendationsID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
NT0050 #05 Y:2025 | 05 | 2025 | Use properly designed and sized hvac equipment | $2,692 | $7,518 |
n/a
|
NT0050 #04 Y:2025 | 04 | 2025 | Purchase equipment instead of leasing | $13,978 | $7,020 |
n/a
|
NT0050 #03 Y:2025 | 03 | 2025 | Utilize higher efficiency lamps and/or ballasts | $26,369 | $56,820 |
n/a
|
NT0050 #02 Y:2025 | 02 | 2025 | Use or replace with energy efficient substitutes | $118,800 | $170,000 |
n/a
|
NT0050 #01 Y:2025 | 01 | 2025 | Purchase equipment instead of leasing | $359,441 | $504,900 |
n/a
|
NT0045 #06 Y:2025 | 06 | 2025 | Begin a practice of predictive / preventative maintenance | $150,000 | $9,690 |
n/a
|
NT0045 #05 Y:2025 | 05 | 2025 | Train operators for maximum operating efficiency | $150,000 | $100,000 |
n/a
|
NT0045 #04 Y:2025 | 04 | 2025 | Utilize higher efficiency lamps and/or ballasts | $65,667 | $138,252 |
n/a
|
NT0045 #03 Y:2025 | 03 | 2025 | Lower temperature during the winter season and vice-versa | $724 | $950 |
n/a
|
NT0045 #02 Y:2025 | 02 | 2025 | Upgrade controls on compressors | $13,920 | $30,800 |
n/a
|
NT0045 #01 Y:2025 | 01 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $6,253 | $5,609 |
n/a
|
SF0467 #07 Y:2015 | 07 | 2015 | Utilize higher efficiency lamps and/or ballasts | $32,647 | $223,755 | |
SF0467 #06 Y:2015 | 06 | 2015 | Install occupancy sensors | $522 | $2,846 | |
SF0467 #05 Y:2015 | 05 | 2015 | Use most efficient type of electric motors | $1,388 | $5,977 | |
SF0467 #04 Y:2015 | 04 | 2015 | Utilize energy-efficient belts and other improved mechanisms | $6,324 | $4,543 | |
SF0467 #03 Y:2015 | 03 | 2015 | Insulate bare equipment | $12,922 | $8,500 | |
SF0467 #02 Y:2015 | 02 | 2015 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,437 | - | |
SF0467 #01 Y:2015 | 01 | 2015 | Turn off equipment during breaks, reduce operating time | $3,119 | - | |
TT0042 #03 Y:2009 | 03 | 2009 | Utilize higher efficiency lamps and/or ballasts | $4,430 | $20,000 | |
TT0042 #02 Y:2009 | 02 | 2009 | Recover waste heat from equipment | $16,800 | $2,900 |