Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

30

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Crushed and broken stone, including riprap
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
NT0045 #06 Y:2025 Begin a practice of predictive / preventative maintenance $150,000 $9,690
NT0045 #05 Y:2025 Train operators for maximum operating efficiency $150,000 $100,000
NT0045 #04 Y:2025 Utilize higher efficiency lamps and/or ballasts $65,667 $138,252
NT0045 #03 Y:2025 Lower temperature during the winter season and vice-versa $724 $950
NT0045 #02 Y:2025 Upgrade controls on compressors $13,920 $30,800
NT0045 #01 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $6,253 $5,609
SF0467 #07 Y:2015 Utilize higher efficiency lamps and/or ballasts $32,647 $223,755
SF0467 #06 Y:2015 Install occupancy sensors $522 $2,846
SF0467 #05 Y:2015 Use most efficient type of electric motors $1,388 $5,977
SF0467 #04 Y:2015 Utilize energy-efficient belts and other improved mechanisms $6,324 $4,543
SF0467 #03 Y:2015 Insulate bare equipment $12,922 $8,500
SF0467 #02 Y:2015 Eliminate leaks in inert gas and compressed air lines/ valves $2,437 -
SF0467 #01 Y:2015 Turn off equipment during breaks, reduce operating time $3,119 -
TT0042 #03 Y:2009 Utilize higher efficiency lamps and/or ballasts $4,430 $20,000
TT0042 #02 Y:2009 Recover waste heat from equipment $16,800 $2,900
TT0042 #01 Y:2009 Use waste heat from hot flue gases to preheat $38,600 $28,400
SD0384 #06 Y:2006 Utilize higher efficiency lamps and/or ballasts $1,242 $5,792
SD0384 #05 Y:2006 Reduce the pressure of compressed air to the minimum required $2,401 -
SD0384 #04 Y:2006 Use adjustable frequency drive or multiple speed motors on existing system $20,082 $13,481
SD0384 #03 Y:2006 Use adjustable frequency drive or multiple speed motors on existing system $115,354 $45,825