ITAC Assessment: CI0056
ITAC logo
ITAC Assessment: CI0056
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Crushed Aggregates for Construction
NAICS 212313: Crushed and Broken Granite Mining and Quarrying
SIC 1423: Crushed and Broken Granite
Sales Range $10
M
to 50
M
# of Employees 20
Plant Area 392,040
ft2
Annual Production 644,403
ton
Production Hrs. Annual 3,536
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $121,943 1,579,180
kWh
Electricity Demand $333,843 10,724
kW-mo/yr
Electricity Fees $152,212 -
TOTAL YEARLY COSTS $607,998
RECOMMENDED SAVINGS* $431,379 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings One-time Revenue or Avoided Cost Savings
01 4.611: Begin a practice of predictive / preventative maintenance $400,000 $100,000 - - - $400,000
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,761 $1,200 $4,123
53,413
kWh
$5,638
-
kW-mo/yr
- -
03 2.9114: Use solar heat to make electricty $9,303 $28,180 $2,766
35,823
kWh
$6,537
-
kW-mo/yr
- -
04 2.3212: Optimize plant power factor $5,225 $6,500 - - $5,225 -
05 2.4133: Use most efficient type of electric motors $4,704 $1,520 $1,843
23,877
kWh
$2,861
-
kW-mo/yr
- -
06 2.4226: Use / purchase optimum sized compressor $1,422 $5,500 $557
7,219
kWh
$865
-
kW-mo/yr
- -
07 2.4231: Reduce the pressure of compressed air to the minimum required $964 $25 $407
5,276
kWh
$557
-
kW-mo/yr
- -
TOTAL RECOMMENDED $431,379 $142,925 $9,696
125,608
kWh
$16,458
-
kW-mo/yr
$5,225 $400,000
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs