Assessment Year | 2023 |
---|---|
Principal Product | Cans for fruit and vegetables |
NAICS | 332431: Metal Can Manufacturing |
SIC | 3411: Metal Cans |
Sales Range | $50 M to 100M |
# of Employees | 200 |
Plant Area |
152,000
ft2
|
Annual Production | 580,000,000
units
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $508,561 | 6,369,278 |
kWh
|
$0.080 |
Electricity Demand | $271,274 | 15,048 |
kW-mo/yr
|
$18.03 |
Electricity Fees | $3,716 | - |
|
- |
Natural Gas | $368,672 | 35,690 |
MMBtu
|
$10.33 |
TOTAL YEARLY COSTS | $1,152,223 | |||
RECOMMENDED SAVINGS* | $82,479 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $76,114 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.6218: Turn off equipment when not in use | $6,168 | - |
$6,168
77,295
kWh
|
- | |
02 | 2.7224: Reduce space conditioning during non-working hours | $3,963 | $344 |
$535
6,706
kWh
|
$3,428
-
MMBtu
|
|
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $16,399 | $8,086 |
$16,399
205,501
kWh
|
- | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $8,524 | $11,610 |
$8,524
106,814
kWh
|
- | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,254 | $13,352 |
$4,254
53,315
kWh
|
- | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,111 | $9,578 |
$2,111
26,449
kWh
|
- | |
07 | 2.9114: Use solar heat to make electricty | $41,060 | $346,427 |
$41,060
514,540
kWh
|
- | |
TOTAL RECOMMENDED | $82,479 | $389,397 |
$79,051
990,620
kWh
|
$3,428
-
MMBtu
|
||
TOTAL IMPLEMENTED | $76,114 | $366,467 |
$72,686
910,856
kWh
|
$3,428
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs