ITAC Assessment: SF0607
ITAC logo
ITAC Assessment: SF0607
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Cans for fruit and vegetables
NAICS 332431: Metal Can Manufacturing
SIC 3411: Metal Cans
Sales Range $50
M
to 100
M
# of Employees 200
Plant Area 152,000
ft2
Annual Production 580,000,000
units
Production Hrs. Annual 6,000
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $508,561 6,369,278
kWh
Electricity Demand $271,274 15,048
kW-mo/yr
Electricity Fees $3,716 -
Natural Gas $368,672 35,690
MMBtu
TOTAL YEARLY COSTS $1,152,223
RECOMMENDED SAVINGS* $82,479 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $76,114

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6218: Turn off equipment when not in use $6,168 - $6,168
77,295
kWh
-
02 2.7224: Reduce space conditioning during non-working hours $3,963 $344 $535
6,706
kWh
$3,428
-
MMBtu
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $16,399 $8,086 $16,399
205,501
kWh
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,524 $11,610 $8,524
106,814
kWh
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,254 $13,352 $4,254
53,315
kWh
-
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,111 $9,578 $2,111
26,449
kWh
-
07 2.9114: Use solar heat to make electricty $41,060 $346,427 $41,060
514,540
kWh
-
TOTAL RECOMMENDED $82,479 $389,397 $79,051
990,620
kWh
$3,428
-
MMBtu
TOTAL IMPLEMENTED $76,114 $366,467 $72,686
910,856
kWh
$3,428
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs