Assessment Year | 2012 |
---|---|
Principal Product | Paper board |
NAICS | 322130: Paperboard Mills |
SIC | 2631: Paperboard Mills |
Sales Range | $50 M to 100M |
# of Employees | 34 |
Plant Area |
130,000
ft2
|
Annual Production | 45,000
thousand feet
|
Production Hrs. Annual | 3,528
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $440,745 | 3,987,000 |
kWh
|
$0.11 |
Electricity Demand | $219,381 | 18,018 |
kW-mo/yr
|
$12.18 |
Electricity Fees | $26,000 | - |
|
- |
Fuel Oil #6 | $1,167,861 | 67,136 |
MMBtu
|
$17.40 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $204,733 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $26,827 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Fuel Oil #6 Savings |
---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $82,439 | $22,540 |
$2,173
24,697
kWh
|
- |
$80,266
-
MMBtu
|
|
02 | 2.2414: Use waste heat from hot flue gases to preheat | $67,234 | $180,000 | - | - |
$67,234
-
MMBtu
|
|
03 | 2.1116: Improve combustion control capability | $23,122 | $100,000 |
$5,565
63,240
kWh
|
- |
$17,557
-
MMBtu
|
|
04 | 2.2511: Insulate bare equipment | $10,370 | $3,000 | - | - |
$10,370
-
MMBtu
|
|
05 | 2.8123: Pay utility bills on time | $11,678 | $500 | - | $11,678 | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,779 | $3,600 |
$4,779
54,312
kWh
|
- | - | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,452 | $8,700 |
$4,452
50,586
kWh
|
- | - | |
08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $659 | $500 |
$659
7,488
kWh
|
- | - | |
TOTAL RECOMMENDED | $204,733 | $318,840 |
$17,628
200,323
kWh
|
$11,678 |
$175,427
-
MMBtu
|
||
TOTAL IMPLEMENTED | $26,827 | $7,100 |
$4,779
54,312
kWh
|
$11,678 |
$10,370
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | Fuel Oil #6 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs