ITAC Assessment: HO0032
ITAC logo
ITAC Assessment: HO0032
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product ADHESIVES
NAICS
n/a
SIC 2891: Adhesives and Sealants
Sales Range $10
M
to 50
M
# of Employees 45
Plant Area
n/a
Annual Production 24,000,000
lb
Production Hrs. Annual 3,000
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $79,856 441,970
kWh
Natural Gas $767 45
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,592 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,183

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #4 Savings Fuel Oil #6 Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,837 $292 $1,957
10,844
kWh
- - $(-120.0)
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,009 $92 $1,009
5,569
kWh
- - -
03 2.4221: Install compressor air intakes in coolest locations $547 $800 $547
2,931
kWh
- - -
04 2.2136: Install / repair insulation on steam lines $862 $1,950 - $301
-
MMBtu
$561
-
MMBtu
-
05 2.2511: Insulate bare equipment $1,295 $211 $1,295
7,034
kWh
- - -
06 2.8121: Apply for tax-free status for energy purchases $2,042 $200 $2,042
-
kWh
- - -
TOTAL RECOMMENDED $7,592 $3,545 $6,850
26,378
kWh
$301
-
MMBtu
$561
-
MMBtu
$(-120.0)
TOTAL IMPLEMENTED $6,183 $795 $6,303
23,447
kWh
- - $(-120.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #4 Savings Fuel Oil #6 Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs