Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

67

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Crop services
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SF0443 #11 Y:2013 Use solar heat to make electricty $67,869 $444,663
SF0443 #10 Y:2013 Minimize contamination of water before treatment $11,793 $50,140
SF0443 #09 Y:2013 Install equipment (eg compactor) to reduce disposal costs $63,378 $31,000
SF0443 #08 Y:2013 Insulate bare equipment $9,060 $45,537
SF0443 #07 Y:2013 Utilize higher efficiency lamps and/or ballasts $4,886 $16,744
SF0443 #06 Y:2013 Utilize higher efficiency lamps and/or ballasts $13,897 $24,840
SF0443 #05 Y:2013 Replace hydraulic / pneumatic equipment with electric equipment $57,826 $69,335
SF0443 #04 Y:2013 Replace hydraulic / pneumatic equipment with electric equipment $21,679 $25,614
SF0443 #03 Y:2013 Turn off equipment when not in use $1,931 -
SF0443 #02 Y:2013 Eliminate leaks in inert gas and compressed air lines/ valves $3,241 $840
SF0443 #01 Y:2013 Use adjustable frequency drive or multiple speed motors on existing system $169,599 $40,264
SF0440 #09 Y:2013 Change procedures / equipment / operating conditions $5,324 $12,624
SF0440 #08 Y:2013 Eliminate leaks in water lines and valves $11,533 $66,403
SF0440 #07 Y:2013 Minimize contamination of water before treatment $17,219 $50,025
SF0440 #06 Y:2013 Install equipment (eg compactor) to reduce disposal costs $40,388 $27,000
SF0440 #05 Y:2013 Utilize higher efficiency lamps and/or ballasts $10,122 $41,610
SF0440 #04 Y:2013 Use adjustable frequency drive or multiple speed motors on existing system $3,854 $11,795
SF0440 #03 Y:2013 Upgrade controls on compressors $10,575 $16,520
SF0440 #02 Y:2013 Install occupancy sensors $4,352 $6,354
SF0440 #01 Y:2013 Use adjustable frequency drive or multiple speed motors on existing system $212,131 $19,224