Assessment Year | 2013 |
---|---|
Principal Product | Packaged Produce |
NAICS | 115114: Postharvest Crop Activities (except Cotton Ginning) |
SIC | 0723: Crop Preparation Services for Market, Except Cotton Ginning |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
71,200
ft2
|
Annual Production | 20,000,000
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $581,800 | 6,734,733 |
kWh
|
$0.086 |
Electricity Demand | $367,866 | 15,852 |
kW-mo/yr
|
$23.21 |
Electricity Fees | $15,864 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $315,498 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $292,955 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Water Disposal Savings | Ancillary Material Cost Savings | Water Consumption Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $212,131 | $19,224 |
$45,744
529,506
kWh
|
$18,540
-
kW-mo/yr
|
- |
$35,250
-
Tgal
|
- |
$112,597
-
Tgal
|
- | |
02 | 2.7135: Install occupancy sensors | $4,352 | $6,354 |
$3,137
36,309
kWh
|
$1,215
-
kW-mo/yr
|
- | - | - | - | - | |
03 | 2.4224: Upgrade controls on compressors | $10,575 | $16,520 |
$10,575
122,409
kWh
|
- | - | - | - | - | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,854 | $11,795 |
$2,817
32,608
kWh
|
$1,037
-
kW-mo/yr
|
- | - | - | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,122 | $41,610 |
$7,161
82,888
kWh
|
$1,918
-
kW-mo/yr
|
- | - | $584 | - | $459 | |
06 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $40,388 | $27,000 | - | - | - | - | - | - | $40,388 | |
07 | 3.4131: Minimize contamination of water before treatment | $17,219 | $50,025 | - | - | - |
$4,255
-
Tgal
|
- |
$12,964
-
Tgal
|
- | |
08 | 3.4154: Eliminate leaks in water lines and valves | $11,533 | $66,403 | - | - | - |
$2,891
-
Tgal
|
- |
$8,642
-
Tgal
|
- | |
09 | 3.1191: Change procedures / equipment / operating conditions | $5,324 | $12,624 | - | - | $5,324 | - | - | - | - | |
TOTAL RECOMMENDED | $315,498 | $251,555 |
$69,434
803,720
kWh
|
$22,710
-
kW-mo/yr
|
$5,324 |
$42,396
-
Tgal
|
$584 |
$134,203
-
Tgal
|
$40,847 | ||
TOTAL IMPLEMENTED | $292,955 | $188,906 |
$69,434
803,720
kWh
|
$22,710
-
kW-mo/yr
|
- |
$38,141
-
Tgal
|
$584 |
$121,239
-
Tgal
|
$40,847 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Water Disposal Savings | Ancillary Material Cost Savings | Water Consumption Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs