ITAC Assessment: SF0440
ITAC logo
ITAC Assessment: SF0440
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Packaged Produce
NAICS 115114: Postharvest Crop Activities (except Cotton Ginning)
SIC 0723: Crop Preparation Services for Market, Except Cotton Ginning
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 71,200
ft2
Annual Production 20,000,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $581,800 6,734,733
kWh
Electricity Demand $367,866 15,852
kW-mo/yr
Electricity Fees $15,864 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $315,498 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $292,955

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Water Disposal Savings Ancillary Material Cost Savings Water Consumption Savings One-time Revenue or Avoided Cost Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $212,131 $19,224 $45,744
529,506
kWh
$18,540
-
kW-mo/yr
- $35,250
-
Tgal
- $112,597
-
Tgal
-
02 2.7135: Install occupancy sensors $4,352 $6,354 $3,137
36,309
kWh
$1,215
-
kW-mo/yr
- - - - -
03 2.4224: Upgrade controls on compressors $10,575 $16,520 $10,575
122,409
kWh
- - - - - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,854 $11,795 $2,817
32,608
kWh
$1,037
-
kW-mo/yr
- - - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $10,122 $41,610 $7,161
82,888
kWh
$1,918
-
kW-mo/yr
- - $584 - $459
06 3.6193: Install equipment (eg compactor) to reduce disposal costs $40,388 $27,000 - - - - - - $40,388
07 3.4131: Minimize contamination of water before treatment $17,219 $50,025 - - - $4,255
-
Tgal
- $12,964
-
Tgal
-
08 3.4154: Eliminate leaks in water lines and valves $11,533 $66,403 - - - $2,891
-
Tgal
- $8,642
-
Tgal
-
09 3.1191: Change procedures / equipment / operating conditions $5,324 $12,624 - - $5,324 - - - -
TOTAL RECOMMENDED $315,498 $251,555 $69,434
803,720
kWh
$22,710
-
kW-mo/yr
$5,324 $42,396
-
Tgal
$584 $134,203
-
Tgal
$40,847
TOTAL IMPLEMENTED $292,955 $188,906 $69,434
803,720
kWh
$22,710
-
kW-mo/yr
- $38,141
-
Tgal
$584 $121,239
-
Tgal
$40,847
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Water Disposal Savings Ancillary Material Cost Savings Water Consumption Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs