Assessment Year | 2003 |
---|---|
Principal Product | Hardwood furniture |
NAICS | 337127: Institutional Furniture Manufacturing |
SIC | 2531: Public Building and Related Furniture |
Sales Range | $10 M to 50M |
# of Employees | 200 |
Plant Area |
140,200
ft2
|
Annual Production | 3,800
thousand feet
|
Production Hrs. Annual | 4,335
hrs
|
Location (State) | New Hampshire |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $265,244 | 3,516,335 |
kWh
|
$0.075 |
Electricity Fees | $14,300 | - |
|
- |
Fuel Oil #2 | $8,642 | 1,318 |
MMBtu
|
$6.56 |
Wood | $63,257 | 27,833 |
MMBtu
|
$2.27 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $166,806 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $2,132 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Fuel Oil #2 Savings | Wood Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.3321: Use steam pressure reduction to generate power | $132,710 | $407,000 | n/a |
$234,477
2,879,329
kWh
|
$52,819
-
kW-mo/yr
|
- |
$(-148,257.0)
-
MMBtu
|
$(-6,329.0)
-
MMBtu
|
02 | 2.2437: Recover waste heat from equipment | $15,152 | $66,000 | n/a | - | - | - | - |
$15,152
-
MMBtu
|
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $6,301 | $13,950 | n/a |
$6,301
87,451
kWh
|
- | - | - | - |
04 | 2.2414: Use waste heat from hot flue gases to preheat | $7,609 | $30,000 | - | - | - | - |
$7,609
-
MMBtu
|
|
05 | 2.8123: Pay utility bills on time | $2,902 | $345 | - | - | $2,902 | - | - | |
06 | 2.2136: Install / repair insulation on steam lines | $1,837 | $827 | - | - | - | - |
$1,837
-
MMBtu
|
|
07 | 2.2135: Repair and eliminate steam leaks | $295 | $600 | - | - | - | - |
$295
-
MMBtu
|
|
TOTAL RECOMMENDED | $166,806 | $518,722 |
$240,778
2,966,780
kWh
|
$52,819
-
kW-mo/yr
|
$2,902 |
$(-148,257.0)
-
MMBtu
|
$18,564
-
MMBtu
|
||
TOTAL IMPLEMENTED | $2,132 | $1,427 | - | - | - | - |
$2,132
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Fuel Oil #2 Savings | Wood Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs