Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

89

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Executive, legislative, and other general government support
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
ORC009 #02 Y:2023 Replace boiler $1,624 $10,000
ORC009 #01 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $654 $2,000
ORC008 #06 Y:2023 Utilize controls to operate equipment only when needed $1,574 $500
ORC008 #05 Y:2023 Use heat pump for space conditioning $668 $5,000
ORC008 #04 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $1,527 $4,000
ORC008 #03 Y:2023 Utilize daylight whenever possible in lieu of artificial light $959 $1,500
ORC008 #02 Y:2023 Install occupancy sensors $474 $100
ORC008 #01 Y:2023 Install timers on light switches in little used areas $2,876 $500
MUCM10 #11 Y:2023 Utilize higher efficiency lamps and/or ballasts $1,533 $5,241
MUCM10 #10 Y:2023 Use separate switches on perimeter lighting which may be turned off when natural light is available $332 $648
MUCM10 #09 Y:2023 Install occupancy sensors $54 $33
MUCM10 #08 Y:2023 Utilize higher efficiency lamps and/or ballasts $366 $1,749
MUCM10 #07 Y:2023 Ventilation system to shut off when room is not in use $2,177 $4,350
MUCM10 #06 Y:2023 Use proper thickness of insulation on building envelope $38 $36
MUCM10 #05 Y:2023 Insulate bare equipment $23 $14
MUCM10 #04 Y:2023 Reduce space conditioning during non-working hours $4,480 $3,150
MUCM10 #03 Y:2023 Reschedule and rearrange multiple-source heating systems $5,210 $600
MUCM10 #02 Y:2023 Reduce illumination to minimum necessary levels $771 -
MUCM10 #01 Y:2023 Use optimum temperature $577 -
ORC005 #03 Y:2022 Install timers and/or thermostats $1,949 $15,000