107
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| TT0281 #08 Y:2022 | 08 | 2022 | Insulate bare equipment | $1,876 | $2,748 | |
| TT0281 #07 Y:2022 | 07 | 2022 | Turn off equipment during breaks, reduce operating time | $2,188 | $560 | |
| TT0281 #06 Y:2022 | 06 | 2022 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,419 | $2,740 | |
| TT0281 #05 Y:2022 | 05 | 2022 | Use adjustable frequency drive or multiple speed motors on existing system | $3,821 | $4,500 | |
| TT0281 #04 Y:2022 | 04 | 2022 | Air condition only space necessary | $5,133 | $6,000 | |
| TT0281 #03 Y:2022 | 03 | 2022 | Use solar heat to make electricty | $12,034 | $44,013 | |
| TT0281 #02 Y:2022 | 02 | 2022 | Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $24,436 | $109,567 | |
| TT0281 #01 Y:2022 | 01 | 2022 | Meter recycled water (to reduce sewer charges) | $58,911 | $10,000 | |
| LS1906 #07 Y:2018 | 07 | 2018 | Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $145,606 | $704,000 | |
| LS1906 #06 Y:2018 | 06 | 2018 | Install vinyl strip / high speed / air curtain doors | $44 | $40 | |
| LS1906 #05 Y:2018 | 05 | 2018 | Utilize higher efficiency lamps and/or ballasts | $41,230 | $16,552 | |
| LS1906 #04 Y:2018 | 04 | 2018 | Use adjustable frequency drive or multiple speed motors on existing system | $53,705 | $15,900 | |
| LS1906 #03 Y:2018 | 03 | 2018 | Install occupancy sensors | $3,895 | $1,125 | |
| LS1906 #02 Y:2018 | 02 | 2018 | Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings | $3,667 | $315 | |
| LS1906 #01 Y:2018 | 01 | 2018 | Reduce the pressure of compressed air to the minimum required | $2,228 | $50 | |
| WV0551 #11 Y:2017 | 11 | 2017 | Reduce the pressure of compressed air to the minimum required | $110 | $33 | |
| WV0551 #10 Y:2017 | 10 | 2017 | Install compressor air intakes in coolest locations | $139 | $663 | |
| WV0551 #09 Y:2017 | 09 | 2017 | Insulate bare equipment | $251 | $578 | |
| WV0551 #08 Y:2017 | 08 | 2017 | Analyze flue gas for proper air/fuel ratio | $447 | $1,000 | |
| WV0551 #07 Y:2017 | 07 | 2017 | Upgrade controls on compressors | $466 | $2,000 |