Assessment Year | 2019 |
---|---|
Principal Product | Laundry |
NAICS | 812332: Industrial Launderers |
SIC | 7218: Industrial Launderers |
Sales Range | $10 M to 50M |
# of Employees | 255 |
Plant Area |
175,000
ft2
|
Annual Production | 42,000,000
lb
|
Production Hrs. Annual | 7,525
hrs
|
Location (State) | Mississippi |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $336,821 | 3,544,880 |
kWh
|
$0.095 |
Natural Gas | $287,501 | 68,848 |
MMBtu
|
$4.18 |
TOTAL YEARLY COSTS | $624,322 | |||
RECOMMENDED SAVINGS* | $250,375 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,228 | $50 |
$2,228
23,454
kWh
|
- | - | |
02 | 3.7312: Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings | $3,667 | $315 |
$3,667
38,591
kWh
|
- | - | |
03 | 2.7135: Install occupancy sensors | $3,895 | $1,125 |
$3,895
41,001
kWh
|
- | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $53,705 | $15,900 |
$53,705
565,225
kWh
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $41,230 | $16,552 |
$41,230
434,005
kWh
|
- | - | |
06 | 2.7447: Install vinyl strip / high speed / air curtain doors | $44 | $40 |
$44
464
kWh
|
- | - | |
07 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $145,606 | $704,000 |
$314,598
3,311,000
kWh
|
$77,773
-
MMBtu
|
$(-246,765.0) | |
TOTAL RECOMMENDED | $250,375 | $737,982 |
$419,367
4,413,740
kWh
|
$77,773
-
MMBtu
|
$(-246,765.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs