Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Laundry
NAICS 812332: Industrial Launderers
SIC 7218: Industrial Launderers
Sales Range $10
M
to 50
M
# of Employees 255
Plant Area 175,000
ft2
Annual Production 42,000,000
lb
Production Hrs. Annual 7,525
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $336,821 3,544,880
kWh
Natural Gas $287,501 68,848
MMBtu
TOTAL YEARLY COSTS $624,322
RECOMMENDED SAVINGS* $250,375 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $2,228 $50 $2,228
23,454
kWh
- -
02 3.7312: Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $3,667 $315 $3,667
38,591
kWh
- -
03 2.7135: Install occupancy sensors $3,895 $1,125 $3,895
41,001
kWh
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $53,705 $15,900 $53,705
565,225
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $41,230 $16,552 $41,230
434,005
kWh
- -
06 2.7447: Install vinyl strip / high speed / air curtain doors $44 $40 $44
464
kWh
- -
07 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $145,606 $704,000 $314,598
3,311,000
kWh
$77,773
-
MMBtu
$(-246,765.0)
TOTAL RECOMMENDED $250,375 $737,982 $419,367
4,413,740
kWh
$77,773
-
MMBtu
$(-246,765.0)
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs