107
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| WV0551 #06 Y:2017 | 06 | 2017 | Develop a repair/replace policy | $866 | $595 | |
| WV0551 #05 Y:2017 | 05 | 2017 | Utilize higher efficiency lamps and/or ballasts | $1,417 | $1,346 | |
| WV0551 #04 Y:2017 | 04 | 2017 | Establish a predictive maintenance program | $4,726 | $1,000 | |
| WV0551 #03 Y:2017 | 03 | 2017 | Use adjustable frequency drive or multiple speed motors on existing system | $5,421 | $14,500 | |
| WV0551 #02 Y:2017 | 02 | 2017 | Reduce the pressure of compressed air to the minimum required | $9,068 | $42,825 | |
| WV0551 #01 Y:2017 | 01 | 2017 | Install sensors to detect and avoid jams | $12,866 | $7,175 | |
| IA0529 #06 Y:2014 | 06 | 2014 | Use steam condensate for hot water supply (non-potable) | $1,950 | $5,000 | |
| IA0529 #05 Y:2014 | 05 | 2014 | Install spectral reflectors / delamp | $569 | $210 | |
| IA0529 #04 Y:2014 | 04 | 2014 | Install / repair insulation on steam lines | $373 | $1,155 | |
| IA0529 #03 Y:2014 | 03 | 2014 | Install vinyl strip / high speed / air curtain doors | $214 | $284 | |
| IA0529 #02 Y:2014 | 02 | 2014 | Use most efficient type of electric motors | $2,154 | $7,444 | |
| IA0529 #01 Y:2014 | 01 | 2014 | Utilize higher efficiency lamps and/or ballasts | $5,348 | $21,947 | |
| MA0730 #06 Y:2014 | 06 | 2014 | Insulate bare equipment | $426 | $1,200 | |
| MA0730 #05 Y:2014 | 05 | 2014 | Eliminate leaks in inert gas and compressed air lines/ valves | $478 | $300 | |
| MA0730 #04 Y:2014 | 04 | 2014 | Reduce ventilation air | $524 | $1,300 | |
| MA0730 #03 Y:2014 | 03 | 2014 | Reduce ventilation air | $1,607 | $4,600 | |
| MA0730 #02 Y:2014 | 02 | 2014 | Use adjustable frequency drive or multiple speed motors on existing system | $4,618 | $4,285 | |
| MA0730 #01 Y:2014 | 01 | 2014 | Change rate schedules or other changes in utility service | $18,229 | $5,000 | |
| DL0117 #05 Y:2013 | 05 | 2013 | Turn off equipment when not in use | $23,476 | $5,870 | |
| DL0117 #04 Y:2013 | 04 | 2013 | Recover waste heat from equipment | $138,552 | $277,104 |