23
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | Casino hotels | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| CI0074 #07 Y:2025 | 07 | 2025 | Recover waste heat from equipment | $3,478 | $20,000 |
n/a
|
| CI0074 #06 Y:2025 | 06 | 2025 | Separate controls of air handlers from ac/ heating systems | $10,135 | $1,600 |
n/a
|
| CI0074 #05 Y:2025 | 05 | 2025 | Utilize higher efficiency lamps and/or ballasts | $16,063 | $28,600 |
n/a
|
| CI0074 #04 Y:2025 | 04 | 2025 | Replace existing hvac unit with high efficiency model | $16,463 | $43,000 |
n/a
|
| CI0074 #03 Y:2025 | 03 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $25,957 | $27,000 |
n/a
|
| CI0074 #02 Y:2025 | 02 | 2025 | Use or replace with energy efficient substitutes | $29,228 | $150,000 |
n/a
|
| CI0074 #01 Y:2025 | 01 | 2025 | Replace boiler | $48,378 | $180,000 |
n/a
|
| WV0475 #16 Y:2013 | 16 | 2013 | Develop a repair/replace policy | $260 | $160 | |
| WV0475 #15 Y:2013 | 15 | 2013 | Establish a predictive maintenance program | $715 | $1,000 | |
| WV0475 #14 Y:2013 | 14 | 2013 | Install / repair insulation on steam lines | $1,243 | $1,168 | |
| WV0475 #13 Y:2013 | 13 | 2013 | Install vinyl strip / high speed / air curtain doors | $1,869 | $1,152 | |
| WV0475 #12 Y:2013 | 12 | 2013 | Install timers and/or thermostats | $2,071 | $750 | |
| WV0475 #11 Y:2013 | 11 | 2013 | Improve air circulation with destratification fans / other methods | $2,308 | $8,400 | |
| WV0475 #10 Y:2013 | 10 | 2013 | Utilize energy-efficient belts and other improved mechanisms | $3,008 | - | |
| WV0475 #09 Y:2013 | 09 | 2013 | Utilize higher efficiency lamps and/or ballasts | $3,383 | $7,846 | |
| WV0475 #08 Y:2013 | 08 | 2013 | Utilize higher efficiency lamps and/or ballasts | $9,352 | $13,858 | |
| WV0475 #07 Y:2013 | 07 | 2013 | Convert liquid heaters from underfiring to immersion or submersion heating | $13,558 | $23,000 | |
| WV0475 #06 Y:2013 | 06 | 2013 | Analyze flue gas for proper air/fuel ratio | $13,965 | $1,700 | |
| WV0475 #05 Y:2013 | 05 | 2013 | Utilize higher efficiency lamps and/or ballasts | $14,150 | $16,076 | |
| WV0475 #04 Y:2013 | 04 | 2013 | Use utility controlled power management | $22,626 | $5,000 |