ITAC Assessment: CI0074
ITAC logo
ITAC Assessment: CI0074
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Hotel and Casino
NAICS 721120: Casino Hotels
SIC 7011: Hotels and Motels
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 100,000
ft2
Annual Production 1
units
Production Hrs. Annual 8,760
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $274,410 2,137,006
kWh
Electricity Demand $147,688 4,224
kW-mo/yr
Electricity Fees $85,342 -
Natural Gas $69,460 4,114
MMBtu
TOTAL YEARLY COSTS $576,900
RECOMMENDED SAVINGS* $149,702 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.1224: Replace boiler $48,378 $180,000 - - $48,378
-
MMBtu
02 2.4322: Use or replace with energy efficient substitutes $29,228 $150,000 $29,228
227,635
kWh
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $25,957 $27,000 $18,431
143,550
kWh
$7,526
-
kW-mo/yr
-
04 2.7232: Replace existing hvac unit with high efficiency model $16,463 $43,000 $16,463
128,220
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $16,063 $28,600 $11,700
91,104
kWh
$4,363
-
kW-mo/yr
-
06 2.7262: Separate controls of air handlers from ac/ heating systems $10,135 $1,600 $10,135
78,930
kWh
- -
07 2.2437: Recover waste heat from equipment $3,478 $20,000 - - $3,478
-
MMBtu
TOTAL RECOMMENDED $149,702 $450,200 $85,957
669,439
kWh
$11,889
-
kW-mo/yr
$51,856
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs