Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

85

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Hotels (except casino hotels) and motels
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
ORC021 #03 Y:2025 Use or replace with energy efficient substitutes $844 $8,800
ORC021 #02 Y:2025 Use photocell controls $424 $590
ORC021 #01 Y:2025 Enhance sensitivity of temperature control and cutoff $71 -
ORC019 #04 Y:2025 Use or replace with energy efficient substitutes $1,275 $10,287
ORC019 #03 Y:2025 Use optimum thickness insulation $1,056 $1,496
ORC019 #02 Y:2025 Use most efficient type of electric motors $1,063 $1,700
ORC019 #01 Y:2025 Ventilation system to shut off when room is not in use $272 $1,750
MZ1018 #05 Y:2025 Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air $26,551 $160,000
MZ1018 #04 Y:2025 Utilize higher efficiency lamps and/or ballasts $7,014 $5,835
MZ1018 #03 Y:2025 Reduce space conditioning during non-working hours $1,533 -
MZ1018 #02 Y:2025 Install occupancy sensors $447 $1,245
MZ1018 #01 Y:2025 Utilize daylight whenever possible in lieu of artificial light $1,704 $7,400
MZ1017 #03 Y:2025 Turn off equipment when not in use $342 $60
MZ1017 #02 Y:2025 Utilize higher efficiency lamps and/or ballasts $533 $700
MZ1017 #01 Y:2025 Use optimum thickness insulation $244 $634
MZ1016 #06 Y:2025 Install occupancy sensors $71 $475
MZ1016 #05 Y:2025 Utilize a less expensive cooling method $2,671 $3,750
MZ1016 #04 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $2,026 $6,750
MZ1016 #03 Y:2025 Minimize water usage $5,716 $2,500
MZ1016 #02 Y:2025 Replace existing equipment with more suitable substitutes $178 $2,000