Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

57

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Junior colleges
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LS0924 #06 Y:2024 Replace existing chiller with high efficiency model $27,561 $98,980
LS0924 #05 Y:2024 Utilize higher efficiency lamps and/or ballasts $5,495 $10,257
LS0924 #04 Y:2024 Reduce heat gain by window tinting $1,620 $2,352
LS0924 #03 Y:2024 Install occupancy sensors $5,358 $875
LS0924 #02 Y:2024 Chill water to the highest temperature possible $1,667 $250
LS0924 #01 Y:2024 Reduce space conditioning during non-working hours $2,991 -
OK1123 #04 Y:2024 Use double or triple glazed windows to maintain higher relative humidity and to reduce heat losses $152 $3,487
OK1123 #03 Y:2024 Use solar heat to make electricty $25,240 $187,200
OK1123 #02 Y:2024 Clean and maintain refrigerant condensers and towers $259 $930
OK1123 #01 Y:2024 Replace existing hvac unit with high efficiency model $1,274 $11,550
OK1121 #04 Y:2024 Clean and maintain refrigerant condensers and towers $3,722 $5,451
OK1121 #03 Y:2024 Reduce heat gain by window tinting $1,883 $40,108
OK1121 #02 Y:2024 Conserve energy by efficient use of vending machines $317 $985
OK1121 #01 Y:2024 Utilize higher efficiency lamps and/or ballasts $2,047 $7,112
UU0253 #05 Y:2024 Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads $150 $450
UU0253 #04 Y:2024 Optimize plant power factor $717 $2,200
UU0253 #03 Y:2024 Purchase gas directly from a contract gas supplier $22,211 $18,400
UU0253 #02 Y:2024 Utilize higher efficiency lamps and/or ballasts $8,113 $26,430
UU0253 #01 Y:2024 Ventilation system to shut off when room is not in use $26,630 $43,200
ORC012 #06 Y:2023 Use computer programs to optimize hvac performance $273 $1,000