| Assessment Year | 2024 |
|---|---|
| Principal Product | NA |
| NAICS | 611210: Junior Colleges |
| SIC | 8222: Junior Colleges and Technical Institutes |
| Sales Range | less than $500 k |
| # of Employees | 60 |
| Plant Area |
151,110
ft2
|
| Annual Production | 1
units
|
| Production Hrs. Annual | 5,840
hrs
|
| Location (State) | Utah |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $49,484 | 1,364,860 |
kWh
|
$0.036 |
| Electricity Demand | $72,956 | 4,591 |
kW-mo/yr
|
$15.89 |
| Natural Gas | $84,401 | 6,974 |
MMBtu
|
$12.10 |
| TOTAL YEARLY COSTS | $206,841 | |||
| RECOMMENDED SAVINGS* | $57,821 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $31,041 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.7311: Ventilation system to shut off when room is not in use | $26,630 | $43,200 |
$8,964
245,670
kWh
|
- | - |
$17,666
-
MMBtu
|
- | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,113 | $26,430 |
$6,282
106,069
kWh
|
$1,831
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.8113: Purchase gas directly from a contract gas supplier | $22,211 | $18,400 | - | - | - | - | $22,211 | |
| 04 | 2.3212: Optimize plant power factor | $717 | $2,200 | - | - | $717 | - | - | |
| 05 | 2.6222: Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads | $150 | $450 |
$150
4,140
kWh
|
- | - | - | - | |
| TOTAL RECOMMENDED | $57,821 | $90,680 |
$15,396
355,879
kWh
|
$1,831
-
kW-mo/yr
|
$717 |
$17,666
-
MMBtu
|
$22,211 | ||
| TOTAL IMPLEMENTED | $31,041 | $47,030 |
$6,282
106,069
kWh
|
$1,831
-
kW-mo/yr
|
$717 | - | $22,211 | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs