ITAC Assessment: UU0253
ITAC logo
ITAC Assessment: UU0253
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product NA
NAICS 611210: Junior Colleges
SIC 8222: Junior Colleges and Technical Institutes
Sales Range less than $500
k
# of Employees 60
Plant Area 151,110
ft2
Annual Production 1
units
Production Hrs. Annual 5,840
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $49,484 1,364,860
kWh
Electricity Demand $72,956 4,591
kW-mo/yr
Natural Gas $84,401 6,974
MMBtu
TOTAL YEARLY COSTS $206,841
RECOMMENDED SAVINGS* $57,821 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.7311: Ventilation system to shut off when room is not in use $26,630 $43,200 $8,964
245,670
kWh
- - $17,666
-
MMBtu
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $8,113 $26,430 $6,282
106,069
kWh
$1,831
-
kW-mo/yr
- - -
03 2.8113: Purchase gas directly from a contract gas supplier $22,211 $18,400 - - - - $22,211
04 2.3212: Optimize plant power factor $717 $2,200 - - $717 - -
05 2.6222: Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads $150 $450 $150
4,140
kWh
- - - -
TOTAL RECOMMENDED $57,821 $90,680 $15,396
355,879
kWh
$1,831
-
kW-mo/yr
$717 $17,666
-
MMBtu
$22,211
TOTAL IMPLEMENTED - - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs