Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

456

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Elementary and secondary schools
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UC2519 #06 Y:2025 Install timers and/or thermostats $8,951 $5,655
UC2519 #05 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $10,040 $1,820
UC2519 #04 Y:2025 Install occupancy sensors $1,261 $6,650
UC2519 #03 Y:2025 Use photocell controls $1,471 $6,650
UC2519 #02 Y:2025 Utilize higher efficiency lamps and/or ballasts $868 $1,247
UC2519 #01 Y:2025 Insulate bare equipment $2,390 $2,700
ORC023 #03 Y:2025 Reduce heat gain by window tinting $82 $197
ORC023 #02 Y:2025 Insulate glazing, walls, ceilings, and roofs $940 $1,661
ORC023 #01 Y:2025 Install occupancy sensors $140 $160
ORC022 #04 Y:2025 Replace boiler $4,147 $88,300
ORC022 #03 Y:2025 Install occupancy sensors $180 $1,311
ORC022 #02 Y:2025 Install spectral reflectors / delamp $1,250 -
ORC022 #01 Y:2025 Use computer programs to optimize hvac performance $4,579 -
AM0967 #04 Y:2025 Use solar heat to make electricty $9,606 $124,800
AM0967 #03 Y:2025 Make a practice of turning off lights when not needed $430 $1,000
AM0967 #02 Y:2025 Avoid introducing hot, humid, or dirty air into hvac system $102 $1,000
AM0967 #01 Y:2025 Chill water to the highest temperature possible $868 $500
LT8436 #04 Y:2025 Change rate schedules or other changes in utility service $306 -
LT8436 #03 Y:2025 Close holes and openings in building such as broken windows $719 $2,400
LT8436 #02 Y:2025 Turn off equipment when not in use $601 $465