ITAC Assessment: ORC027
ITAC logo
ITAC Assessment: ORC027
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product none
NAICS 611110: Elementary and Secondary Schools
SIC 8211: Elementary and Secondary Schools
Sales Range less than $500
k
# of Employees 25
Plant Area 80,000
ft2
Annual Production 1
units
Production Hrs. Annual 8,760
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $29,441 312,840
kWh
Electricity Demand $12,709 609
kW-mo/yr
Electricity Fees $10,910 -
Natural Gas $24,373 1,899
MMBtu
Waste Disposal Costs
Water Usage $5,000 1,000
Tgal
TOTAL YEARLY COSTS $82,433
RECOMMENDED SAVINGS* $28,840 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7226: Use computer programs to optimize hvac performance $1,315 - $1,315
13,975
kWh
-
02 2.4239: Eliminate or reduce compressed air usage $112 $25 $112
1,188
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $11,134 $8,101 $5,891
62,600
kWh
$5,243
-
kW-mo/yr
04 2.7226: Use computer programs to optimize hvac performance $1,254 $1,732 $961
10,216
kWh
$293
-
kW-mo/yr
05 2.7229: Air condition only space necessary $591 $1,000 $591
6,285
kWh
-
06 2.9114: Use solar heat to make electricty $14,434 $204,700 $10,302
109,472
kWh
$4,132
-
kW-mo/yr
TOTAL RECOMMENDED $28,840 $215,558 $19,172
203,736
kWh
$9,668
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs