Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Specialty food stores
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SU0576 #12 Y:2025 Use solar heat to make electricty $32,946 $668,352
SU0576 #11 Y:2025 Install an uninteruptable power supply $35,256 $160,000
SU0576 #10 Y:2025 Conserve energy by efficient use of vending machines $221 $899
SU0576 #09 Y:2025 Use or replace with energy efficient substitutes $287 $403
SU0576 #08 Y:2025 Repair and eliminate steam leaks $3,215 $2,800
SU0576 #07 Y:2025 Utilize higher efficiency lamps and/or ballasts $23,941 $17,246
SU0576 #06 Y:2025 Insulate bare equipment $1,088 $728
SU0576 #05 Y:2025 Install compressor air intakes in coolest locations $2,825 $372
SU0576 #04 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $1,295 $125
SU0576 #03 Y:2025 Use or replace with energy efficient substitutes $472 $18
SU0576 #02 Y:2025 Reduce the pressure of compressed air to the minimum required $4,743 -
SU0576 #01 Y:2025 Reschedule plant operations or reduce load to avoid peaks $15,976 -
SD0449 #08 Y:2012 Optimize plant power factor $3,189 $5,775
SD0449 #07 Y:2012 Utilize higher efficiency lamps and/or ballasts $1,186 $2,022
SD0449 #06 Y:2012 Replace electrically-operated equipment with fossil fuel equipment $865 $1,500
SD0449 #05 Y:2012 Install occupancy sensors $1,629 $2,471
SD0449 #04 Y:2012 Repair and eliminate steam leaks $4,456 $1,200
SD0449 #03 Y:2012 Repair and eliminate steam leaks $1,042 $200
SD0449 #02 Y:2012 Utilize daylight whenever possible in lieu of artificial light $3,454 $100
SD0449 #01 Y:2012 Reduce the pressure of compressed air to the minimum required $4,392 $100