9
matching recommendationsID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
SD0469 #09 Y:2013 | 09 | 2013 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,250 | $200 | |
SD0469 #08 Y:2013 | 08 | 2013 | Reduce the pressure of compressed air to the minimum required | $1,817 | $600 | |
SD0469 #07 Y:2013 | 07 | 2013 | Recharge batteries on during off-peak demand periods | $3,825 | $1,500 | |
SD0469 #06 Y:2013 | 06 | 2013 | Replace electrically-operated equipment with fossil fuel equipment | $7,769 | $7,320 | |
SD0469 #05 Y:2013 | 05 | 2013 | Replace electrically-operated equipment with fossil fuel equipment | $10,014 | $15,500 | |
SD0469 #04 Y:2013 | 04 | 2013 | Use adjustable frequency drive or multiple speed motors on existing system | $10,246 | $10,350 | |
SD0469 #03 Y:2013 | 03 | 2013 | Replace existing hvac unit with high efficiency model | $15,384 | $50,200 | |
SD0469 #02 Y:2013 | 02 | 2013 | Use optimum size and capacity equipment | $23,156 | $8,740 | |
SD0469 #01 Y:2013 | 01 | 2013 | Clean or color roof to reduce solar load | $37,421 | $53,250 |