Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

88

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Grocery and related product merchant wholesalers
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
CI0083 #08 Y:2026 Use double or triple glazed windows to maintain higher relative humidity and to reduce heat losses $2,328 $20,000
CI0083 #07 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $5,392 $300
CI0083 #06 Y:2026 Install occupancy sensors $8,004 $3,900
CI0083 #05 Y:2026 Recharge batteries on during off-peak demand periods $10,068 $450
CI0083 #04 Y:2026 Install or upgrade insulation on hvac distribution systems $10,501 $59,000
CI0083 #03 Y:2026 Use photocell controls $13,865 $10,000
CI0083 #02 Y:2026 Adjust / maintain fork lift trucks for most efficient operation $36,073 $11,275
CI0083 #01 Y:2026 Use solar heat to make electricty $112,782 $884,361
MI0461 #05 Y:2025 Replace existing hvac unit with high efficiency model $6,646 $33,112
MI0461 #04 Y:2025 Turn off equipment during breaks, reduce operating time $3,684 $2,240
MI0461 #03 Y:2025 Lower temperature during the winter season and vice-versa $4,724 $1,840
MI0461 #02 Y:2025 Reschedule plant operations or reduce load to avoid peaks $4,685 -
MI0461 #01 Y:2025 Recharge batteries on during off-peak demand periods $7,156 -
AS0536 #05 Y:2022 Install occupancy sensors $294 $77
AS0536 #04 Y:2022 Utilize energy-efficient belts and other improved mechanisms $1,609 $579
AS0536 #03 Y:2022 Use computer programs to optimize hvac performance $7,644 $1,415
AS0536 #02 Y:2022 Use adjustable frequency drive or multiple speed motors on existing system $19,017 $3,981
AS0536 #01 Y:2022 Use solar heat to make electricty $43,996 $407,250
KS2206 #08 Y:2022 Use solar heat to make electricty $85,249 $849,734
KS2206 #07 Y:2022 Utilize higher efficiency lamps and/or ballasts $2,386 $4,602