Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

18

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Paper and paper product merchant wholesalers
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LE0276 #09 Y:2008 Install occupancy sensors $12,548 $600
LE0276 #08 Y:2008 Utilize higher efficiency lamps and/or ballasts $36,479 $53,518
LE0276 #07 Y:2008 Install partitions to reduce size of conditioned space $1,838 $3,600
LE0276 #06 Y:2008 Install vinyl strip / high speed / air curtain doors $10,749 $16,800
LE0276 #05 Y:2008 Purchase gas directly from a contract gas supplier $15,550 $500
LE0276 #04 Y:2008 Replace existing hvac unit with high efficiency model $18,230 $16,000
LE0276 #03 Y:2008 Shift from daytime to nighttime operation $38,127 $30,600
LE0276 #02 Y:2008 Use cooling tower or economizer to replace chiller cooling $55,360 $30,000
LE0276 #01 Y:2008 Replace existing hvac unit with high efficiency model $144,000 $92,000
BD0328 #09 Y:2007 Minimize water usage $1,171 $4,000
BD0328 #08 Y:2007 Install compressor air intakes in coolest locations $1,128 $500
BD0328 #07 Y:2007 Utilize energy-efficient belts and other improved mechanisms $1,183 $2,730
BD0328 #06 Y:2007 Utilize higher efficiency lamps and/or ballasts $498 $585
BD0328 #05 Y:2007 Install occupancy sensors $1,328 $150
BD0328 #04 Y:2007 Utilize higher efficiency lamps and/or ballasts $1,358 $2,109
BD0328 #03 Y:2007 Use photocell controls $1,823 $90
BD0328 #02 Y:2007 Install vinyl strip / high speed / air curtain doors $4,262 $14,000
BD0328 #01 Y:2007 Install vinyl strip / high speed / air curtain doors $7,446 $2,400