32
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| CI0082 #07 Y:2026 | 07 | 2026 | Use adjustable frequency drive or multiple speed motors on existing system | $674 | $7,500 |
n/a
|
| CI0082 #06 Y:2026 | 06 | 2026 | Adjust / maintain fork lift trucks for most efficient operation | $1,644 | $12,000 |
n/a
|
| CI0082 #05 Y:2026 | 05 | 2026 | Replace existing hvac unit with high efficiency model | $1,818 | $8,000 |
n/a
|
| CI0082 #04 Y:2026 | 04 | 2026 | Turn off equipment when not in use | $2,859 | $360 |
n/a
|
| CI0082 #03 Y:2026 | 03 | 2026 | Install occupancy sensors | $2,897 | $1,350 |
n/a
|
| CI0082 #02 Y:2026 | 02 | 2026 | Utilize higher efficiency lamps and/or ballasts | $3,085 | $3,195 |
n/a
|
| CI0082 #01 Y:2026 | 01 | 2026 | Eliminate leaks in inert gas and compressed air lines/ valves | $11,271 | $5,300 |
n/a
|
| UD1077 #04 Y:2023 | 04 | 2023 | Use solar heat to make electricty | $6,384 | $78,400 | |
| UD1077 #03 Y:2023 | 03 | 2023 | Insulate glazing, walls, ceilings, and roofs | $145 | $550 | |
| UD1077 #02 Y:2023 | 02 | 2023 | Use heat pump for space conditioning | $2,002 | $25,200 | |
| UD1077 #01 Y:2023 | 01 | 2023 | Use radiant heater for spot heating | $1,038 | $5,500 | |
| DL0097 #09 Y:2012 | 09 | 2012 | Install timers on light switches in little used areas | $590 | $100 | |
| DL0097 #08 Y:2012 | 08 | 2012 | Utilize controls to operate equipment only when needed | $570 | $100 | |
| DL0097 #07 Y:2012 | 07 | 2012 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,570 | $2,500 | |
| DL0097 #06 Y:2012 | 06 | 2012 | Turn off equipment when not in use | $3,800 | $500 | |
| DL0097 #05 Y:2012 | 05 | 2012 | Utilize controls to operate equipment only when needed | $6,780 | $500 | |
| DL0097 #04 Y:2012 | 04 | 2012 | Utilize higher efficiency lamps and/or ballasts | $9,670 | $40,320 | |
| DL0097 #03 Y:2012 | 03 | 2012 | Lower temperature during the winter season and vice-versa | $8,900 | $100 | |
| DL0097 #02 Y:2012 | 02 | 2012 | Replace fossil fuel equipment with electrical equipment | $3,650 | $2,490 | |
| DL0097 #01 Y:2012 | 01 | 2012 | Reschedule plant operations or reduce load to avoid peaks | $11,670 | $100 |