Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

56

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Motor vehicle and motor vehicle parts and supplies merchant wholesalers
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
NT0025 #06 Y:2024 Change operating conditions $150,000 $1,200,000
NT0025 #05 Y:2024 Optimize plant power factor $2,643 $1,302
NT0025 #04 Y:2024 Install equipment (eg compactor) to reduce disposal costs $36,410 $21,995
NT0025 #03 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $6,511 $906
NT0025 #02 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $2,914 $5,609
NT0025 #01 Y:2024 Reduce the pressure of compressed air to the minimum required $4,136 -
LE0340 #15 Y:2012 Utilize higher efficiency lamps and/or ballasts $2,205 $10,010
LE0340 #14 Y:2012 Eliminate leaks in inert gas and compressed air lines/ valves $262 $520
LE0340 #13 Y:2012 Make a practice of turning off lights when not needed $9,090 -
LE0340 #12 Y:2012 Install occupancy sensors $16,429 $30,000
LE0340 #11 Y:2012 Install compressor air intakes in coolest locations $586 $800
LE0340 #10 Y:2012 Eliminate leaks in inert gas and compressed air lines/ valves $3,096 $12,800
LE0340 #09 Y:2012 Replace existing hvac unit with high efficiency model $3,535 $21,000
LE0340 #08 Y:2012 Install timers and/or thermostats $16,632 $3,000
LE0340 #07 Y:2012 Eliminate leaks in inert gas and compressed air lines/ valves $1,391 $1,900
LE0340 #06 Y:2012 Clean or color roof to reduce solar load $10,053 $13,598
LE0340 #05 Y:2012 Insulate glazing, walls, ceilings, and roofs $5,033 $5,527
LE0340 #04 Y:2012 Install timers and/or thermostats $26,676 -
LE0340 #03 Y:2012 Eliminate leaks in inert gas and compressed air lines/ valves $953 $1,000
LE0340 #02 Y:2012 Utilize higher efficiency lamps and/or ballasts $32,208 $54,225