Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

57

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Doll, toy, and game manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MA0798 #09 Y:2018 Re-size charging openings or add movable cover or door $512 $200
MA0798 #08 Y:2018 Use or replace with energy efficient substitutes $922 $978
MA0798 #07 Y:2018 Install vinyl strip / high speed / air curtain doors $1,849 $2,001
MA0798 #06 Y:2018 Install heat pipes / raise cooling setpoint $2,585 $500
MA0798 #05 Y:2018 Insulate bare equipment $3,333 $1,801
MA0798 #04 Y:2018 Reduce the pressure of compressed air to the minimum required $3,904 $2,765
MA0798 #03 Y:2018 Recover waste heat from equipment $7,569 $8,930
MA0798 #02 Y:2018 Use cooling tower or economizer to replace chiller cooling $18,484 $80,000
MA0798 #01 Y:2018 Use adjustable frequency drive or multiple speed motors on existing system $39,625 $48,500
MZ0199 #06 Y:2015 Clean or color roof to reduce solar load $4,502 $27,000
MZ0199 #05 Y:2015 Eliminate leaks in inert gas and compressed air lines/ valves $279 $20
MZ0199 #04 Y:2015 Install occupancy sensors $1,508 $440
MZ0199 #03 Y:2015 Utilize higher efficiency lamps and/or ballasts $31,470 $116,250
MZ0199 #02 Y:2015 Condense operation into one building $19,376 $2,500
MZ0199 #01 Y:2015 Condense operation into one building $14,201 $28,800
CO0646 #08 Y:2011 Install vinyl strip / high speed / air curtain doors $150 $40
CO0646 #07 Y:2011 Install wind powered electric generator $270 $5,260
CO0646 #06 Y:2011 Utilize higher efficiency lamps and/or ballasts $1,340 $2,730
CO0646 #05 Y:2011 Use solar heat to make electricty $1,910 $35,000
CO0646 #04 Y:2011 Improve air circulation with destratification fans / other methods $2,080 $14,690