ITAC Assessment: MA0798
ITAC logo
ITAC Assessment: MA0798
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Printing toys and games
NAICS 339930: Doll, Toy, and Game Manufacturing
SIC 3944: Games, Toys, and Children's Vehicles, Except Dolls and Bicycles
Sales Range $10
M
to 50
M
# of Employees 420
Plant Area 1,200,000
ft2
Annual Production 2,500,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,333,988 16,192,705
kWh
Electricity Demand $195,913 37,388
kW-mo/yr
Electricity Fees $124,422 -
Natural Gas $252,090 27,546
MMBtu
TOTAL YEARLY COSTS $2,906,413
RECOMMENDED SAVINGS* $78,783 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $63,803

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $39,625 $48,500 $39,625
275,174
kWh
- -
02 2.2614: Use cooling tower or economizer to replace chiller cooling $18,484 $80,000 $18,484
128,364
kWh
- -
03 2.2437: Recover waste heat from equipment $7,569 $8,930 - - $7,569
-
MMBtu
04 2.4231: Reduce the pressure of compressed air to the minimum required $3,904 $2,765 $3,904
27,113
kWh
- -
05 2.2511: Insulate bare equipment $3,333 $1,801 $3,333
23,147
kWh
- -
06 2.7272: Install heat pipes / raise cooling setpoint $2,585 $500 $2,585
17,954
kWh
- -
07 2.7447: Install vinyl strip / high speed / air curtain doors $1,849 $2,001 - - $1,849
-
MMBtu
08 2.4322: Use or replace with energy efficient substitutes $922 $978 $809
5,616
kWh
$113
-
kW-mo/yr
-
09 2.2531: Re-size charging openings or add movable cover or door $512 $200 $512
3,552
kWh
- -
TOTAL RECOMMENDED $78,783 $145,675 $69,252
480,920
kWh
$113
-
kW-mo/yr
$9,418
-
MMBtu
TOTAL IMPLEMENTED $63,803 $132,502 $61,954
430,237
kWh
- $1,849
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs