Assessment Year | 2001 |
---|---|
Principal Product | Chemical Products |
NAICS |
n/a
|
SIC | 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 80 |
Plant Area |
500,000
ft2
|
Annual Production | 58,000,000
ton
|
Production Hrs. Annual | 8,640
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $346,012 | 10,380,284 |
kWh
|
$0.033 |
Electricity Demand | $136,838 | 16,649 |
kW-mo/yr
|
$8.22 |
Electricity Fees | $6,815 | - |
|
- |
Natural Gas | $1,225,175 | 309,538 |
MMBtu
|
$3.96 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $255,169 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $163,070 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Solid Waste (haz) Savings | Personnel Changes Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 3.1161: Eliminate/reduce an operation | $69,313 | - | - | - | - |
$10,345
-
MMBtu
|
- | $58,968 | - | |
02 | 2.2121: Increase amount of condensate returned | $55,066 | $8,241 | n/a | - | - | - |
$36,663
-
MMBtu
|
- | - |
$18,403
-
Tgal
|
03 | 2.2162: Reduce excess steam bleeding | $32,800 | $156 | - | - | - |
$32,800
-
MMBtu
|
- | - | - | |
04 | 2.2135: Repair and eliminate steam leaks | $31,880 | $1,080 | - | - | - |
$31,880
-
MMBtu
|
- | - | - | |
05 | 4.514: Re-arrange equipment layout to reduce handling costs | $17,010 | - | - | - | - | - | - | $17,010 | - | |
06 | 2.2162: Reduce excess steam bleeding | $14,571 | $155 | - | - | - |
$14,571
-
MMBtu
|
- | - | - | |
07 | 2.2511: Insulate bare equipment | $14,688 | $20,194 | - | - | - |
$14,688
-
MMBtu
|
- | - | - | |
08 | 2.2191: Substitute hot process fluids for steam | $6,882 | $820 | - | - | - |
$5,982
-
MMBtu
|
- | - |
$900
-
Tgal
|
|
09 | 2.4314: Use synthetic lubricant | $3,975 | - |
$2,312
69,200
kWh
|
$1,663
-
kW-mo/yr
|
- | - | - | - | - | |
10 | 3.5217: Reuse / recycle/ sell paper products | $3,293 | $35 | - | - | - | - |
$3,293
-
lb
|
- | - | |
11 | 4.821: Pay bills on time to avoid late fees | $1,998 | - | - | - | $1,998 | - | - | - | - | |
12 | 2.2136: Install / repair insulation on steam lines | $1,855 | $277 | - | - | - |
$1,855
-
MMBtu
|
- | - | - | |
13 | 2.2136: Install / repair insulation on steam lines | $1,580 | $826 | - | - | - |
$1,580
-
MMBtu
|
- | - | - | |
14 | 2.2511: Insulate bare equipment | $258 | $249 | - | - | - |
$258
-
MMBtu
|
- | - | - | |
TOTAL RECOMMENDED | $255,169 | $32,033 |
$2,312
69,200
kWh
|
$1,663
-
kW-mo/yr
|
$1,998 |
$150,622
-
MMBtu
|
$3,293
-
lb
|
$75,978 |
$19,303
-
Tgal
|
||
TOTAL IMPLEMENTED | $163,070 | $23,387 | - | - | $1,998 |
$80,901
-
MMBtu
|
$3,293
-
lb
|
$75,978 |
$900
-
Tgal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Solid Waste (haz) Savings | Personnel Changes Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs