ITAC Assessment: UU0204
ITAC logo
ITAC Assessment: UU0204
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Fluid seals
NAICS 339991: Gasket, Packing, and Sealing Device Manufacturing
SIC 3053: Gaskets, Packing, and Sealing Devices
Sales Range $5
M
to 10
M
# of Employees 300
Plant Area 130,000
ft2
Annual Production 90,000,000
pieces
Production Hrs. Annual 8,757
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $297,928 8,800,200
kWh
Electricity Demand $254,511 17,256
kW-mo/yr
Electricity Fees $154,328 -
Natural Gas $26,722 2,915
MMBtu
TOTAL YEARLY COSTS $733,489
RECOMMENDED SAVINGS* $92,452 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.6218: Turn off equipment when not in use $45,240 $17,600 $45,240
1,330,600
kWh
-
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $13,275 $12,600 - $13,275
-
kW-mo/yr
03 2.2314: Replace heat treating oven with more efficient unit $10,674 $25,650 $6,426
188,997
kWh
$4,248
-
kW-mo/yr
04 2.4322: Use or replace with energy efficient substitutes $7,347 $5,215 $2,489
73,200
kWh
$4,858
-
kW-mo/yr
05 2.4224: Upgrade controls on compressors $4,414 $1,000 $4,414
129,827
kWh
-
06 2.7491: Insulate glazing, walls, ceilings, and roofs $4,228 $2,448 $2,651
77,991
kWh
$1,577
-
kW-mo/yr
07 2.4322: Use or replace with energy efficient substitutes $2,552 $4,497 $1,338
39,354
kWh
$1,214
-
kW-mo/yr
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,260 $3,781 $2,260
66,470
kWh
-
09 2.4235: Remove or close off unneeded compressed air lines $1,637 $1,536 $1,637
48,155
kWh
-
10 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $825 $900 $825
24,274
kWh
-
TOTAL RECOMMENDED $92,452 $75,227 $67,280
1,978,868
kWh
$25,172
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs