Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

49

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Jewelry and silverware manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SU0396 #12 Y:2015 Add area lighting switches $781 $3,851
SU0396 #11 Y:2015 Conserve energy by efficient use of vending machines $112 $462
SU0396 #10 Y:2015 Install compressor air intakes in coolest locations $419 -
SU0396 #09 Y:2015 Eliminate/reduce an operation $1,222 $2,440
SU0396 #08 Y:2015 Replace existing hvac unit with high efficiency model $18,009 $17,408
SU0396 #07 Y:2015 Eliminate leaks in inert gas and compressed air lines/ valves $1,544 $1,250
SU0396 #06 Y:2015 Replace electrically-operated equipment with fossil fuel equipment $17,027 $20,360
SU0396 #05 Y:2015 Utilize higher efficiency lamps and/or ballasts $1,889 $930
SU0396 #04 Y:2015 Check for accuracy of utility / power meters $243 -
SU0396 #03 Y:2015 Reduce the pressure of compressed air to the minimum required $486 -
SU0396 #02 Y:2015 Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads $738 -
SU0396 #01 Y:2015 Pay bills on time to avoid late fees $813 -
BD0456 #11 Y:2015 Install occupancy sensors $374 $750
BD0456 #10 Y:2015 Utilize higher efficiency lamps and/or ballasts $606 $400
BD0456 #09 Y:2015 Utilize higher efficiency lamps and/or ballasts $1,006 $548
BD0456 #08 Y:2015 Reduce illumination to minimum necessary levels $678 $210
BD0456 #07 Y:2015 Install compressor air intakes in coolest locations $685 $1,500
BD0456 #06 Y:2015 Use most efficient type of electric motors $843 $920
BD0456 #05 Y:2015 Use power during off-peak periods $1,111 $17
BD0456 #04 Y:2015 Utilize higher efficiency lamps and/or ballasts $1,225 $1,219