Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,397

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Other miscellaneous manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OR0805 #06 Y:2025 Use solar heat to make electricty $103,946 $1,750,000
OR0805 #05 Y:2025 Regrind, reuse, or sell scrap plastic parts $5,605 -
OR0805 #04 Y:2025 Reduce the pressure of compressed air to the minimum required $4,157 $3,706
OR0805 #03 Y:2025 Turn off equipment during breaks, reduce operating time $928 -
OR0805 #02 Y:2025 Minimize operation of equipment maintained in standby condition $2,187 -
OR0805 #01 Y:2025 Eliminate or reduce compressed air usage $26,892 -
SD0667 #07 Y:2024 Reduce the pressure of compressed air to the minimum required $3,797 -
SD0667 #06 Y:2024 Adopt in-house material generation $17,049 $46,406
SD0667 #05 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $2,877 $3,727
SD0667 #04 Y:2024 Use insulation in furnaces to facilitate heating / cooling $2,121 $299
SD0667 #03 Y:2024 Utilize higher efficiency lamps and/or ballasts $41,190 $8,318
SD0667 #02 Y:2024 Use battery storage for demand control $260,930 $10,784
SD0667 #01 Y:2024 Use solar heat to make electricty $418,912 $524,659
WM0227 #04 Y:2024 Eliminate or reduce compressed air usage $727 -
WM0227 #03 Y:2024 Install compressor air intakes in coolest locations $787 $2,103
WM0227 #02 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $1,869 $2,450
WM0227 #01 Y:2024 Utilize higher efficiency lamps and/or ballasts $4,765 $7,055
OK1127 #07 Y:2024 Optimize plant power factor $1,583 $11,180
OK1127 #06 Y:2024 Install timers and/or thermostats $2,477 $5,850
OK1127 #05 Y:2024 Use radiant heater for spot heating $6,939 $58,500