Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,331

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Miscellaneous manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SU0558 #10 Y:2024 Use solar heat to make electricty $464,734 $1,825,256
SU0558 #08 Y:2024 Conserve energy by efficient use of vending machines $379 $555
SU0558 #07 Y:2024 Install compressor air intakes in coolest locations $2,442 $2,158
SU0558 #03 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $4,187 $170
SU0558 #02 Y:2024 Eliminate or reduce compressed air usage $1,790 -
UF0616 #04 Y:2024 Utilize controls to operate equipment only when needed $5,125 $25,440
UF0616 #02 Y:2024 Improve air circulation with destratification fans / other methods $21,638 $12,552
WV0659 #03 Y:2024 Replace obsolete burners with more efficient ones $6,267 $2,720
WV0659 #02 Y:2024 Upgrade controls on compressors $17,495 $16,930
WV0659 #01 Y:2024 Utilize higher efficiency lamps and/or ballasts $59,309 $62,726
MI0437 #04 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $28,425 $24,780
MI0437 #03 Y:2023 Change rate schedules or other changes in utility service $92,403 $2,400
MI0437 #01 Y:2023 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $595,572 $1,797,720
SD0649 #09 Y:2023 Install direct acting units in place of compressed air pressure system in safety system $12,769 $40,200
SD0649 #08 Y:2023 Use waste heat from hot flue gases to preheat $916 $3,000
SD0649 #06 Y:2023 Reschedule plant operations or reduce load to avoid peaks $570,483 -
SD0649 #05 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $52,035 $39,675
SD0649 #04 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $142,164 $183,960
SD0649 #03 Y:2023 Use battery storage for demand control $657,585 -
SD0649 #02 Y:2023 Use solar heat to make electricty $742,364 $1,089,169