42
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| NC0500 #12 Y:2013 | 12 | 2013 | Reduce illumination to minimum necessary levels | $3,622 | $775 | |
| NC0500 #11 Y:2013 | 11 | 2013 | Utilize higher efficiency lamps and/or ballasts | $456 | $2,704 | |
| NC0500 #10 Y:2013 | 10 | 2013 | Meter waste water | $4,155 | $4,200 | |
| NC0500 #09 Y:2013 | 09 | 2013 | Avoid introducing hot, humid, or dirty air into hvac system | $286 | $750 | |
| NC0500 #08 Y:2013 | 08 | 2013 | Turn off equipment when not in use | $9,389 | $7,000 | |
| NC0500 #07 Y:2013 | 07 | 2013 | Eliminate or reduce compressed air usage | $577 | $875 | |
| NC0500 #06 Y:2013 | 06 | 2013 | Reduce the pressure of compressed air to the minimum required | $3,293 | $125 | |
| NC0500 #05 Y:2013 | 05 | 2013 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,558 | $100 | |
| NC0500 #04 Y:2013 | 04 | 2013 | Reduce fluid flow rates | $34,287 | $18,000 | |
| NC0500 #03 Y:2013 | 03 | 2013 | Air condition only space necessary | $4,146 | $200 | |
| NC0500 #02 Y:2013 | 02 | 2013 | Make a new by-product | $86,815 | $250,000 | |
| NC0500 #01 Y:2013 | 01 | 2013 | Use fossil fuel powered generator during peak demand periods | $59,689 | $250,000 | |
| NC0450 #10 Y:2012 | 10 | 2012 | Improve space comfort conditioning | $4,739 | $8,000 | |
| NC0450 #09 Y:2012 | 09 | 2012 | Maintain clean conditions before painting | $38,389 | $30,000 | |
| NC0450 #08 Y:2012 | 08 | 2012 | Modify process to reduce material use/cost | $105,000 | $40,000 | |
| NC0450 #07 Y:2012 | 07 | 2012 | Add/modify equipment to improve drying process | $113,534 | $25,000 | |
| NC0450 #06 Y:2012 | 06 | 2012 | Use flue gases to heat process or service water | $632 | $2,035 | |
| NC0450 #05 Y:2012 | 05 | 2012 | Utilize higher efficiency lamps and/or ballasts | $1,286 | $973 | |
| NC0450 #04 Y:2012 | 04 | 2012 | Utilize higher efficiency lamps and/or ballasts | $25,655 | $98,739 | |
| NC0450 #03 Y:2012 | 03 | 2012 | Eliminate leaks in inert gas and compressed air lines/ valves | $6,109 | $100 |