ITAC Assessment: NC0500
ITAC logo
ITAC Assessment: NC0500
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Commercial display shelving
NAICS 337215: Showcase, Partition, Shelving, and Locker Manufacturing
SIC 2541: Wood Office and Store Fixtures, Partitions, Shelving, and Lockers
Sales Range $10
M
to 50
M
# of Employees 145
Plant Area 387,000
ft2
Annual Production 100,000
pieces
Production Hrs. Annual 2,250
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $216,156 2,933,000
kWh
Electricity Demand $125,076 9,362
kW-mo/yr
Electricity Fees $(-17,857.0) -
Natural Gas $31,925 3,434
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $208,869 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $147,842

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.3192: Use fossil fuel powered generator during peak demand periods $59,689 $250,000 $4,953
67,200
kWh
$87,960
-
kW-mo/yr
$(-28,224.0)
-
MMBtu
- - - $(-5,000.0) -
02 3.1182: Make a new by-product $86,815 $250,000 $(-6,185.0)
(-83,925)
kWh
- - - $93,000
-
lb
- - -
03 2.7229: Air condition only space necessary $4,146 $200 $2,329
31,600
kWh
$1,817
-
kW-mo/yr
- - - - - -
04 2.5123: Reduce fluid flow rates $34,287 $18,000 $16,941
229,861
kWh
$17,346
-
kW-mo/yr
- - - - - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,558 $100 $1,649
22,380
kWh
$449
-
kW-mo/yr
- - - $(-300.0) - $(-240.0)
06 2.4231: Reduce the pressure of compressed air to the minimum required $3,293 $125 $1,627
22,079
kWh
$1,666
-
kW-mo/yr
- - - - - -
07 2.4239: Eliminate or reduce compressed air usage $577 $875 $577
7,825
kWh
- - - - - - -
08 2.6218: Turn off equipment when not in use $9,389 $7,000 $9,389
127,395
kWh
- - - - - - -
09 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $286 $750 $141
1,916
kWh
$145
-
kW-mo/yr
- - - - - -
10 3.4155: Meter waste water $4,155 $4,200 - - - $4,155
-
Tgal
- - - -
11 2.7142: Utilize higher efficiency lamps and/or ballasts $456 $2,704 $226
3,060
kWh
$230
-
kW-mo/yr
- - - - - -
12 2.7111: Reduce illumination to minimum necessary levels $3,622 $775 $1,586
21,505
kWh
$1,623
-
kW-mo/yr
- - - - - $413
13 2.7135: Install occupancy sensors $596 $1,565 $596
8,088
kWh
- - - - - - -
TOTAL RECOMMENDED $208,869 $536,294 $33,829
458,984
kWh
$111,236
-
kW-mo/yr
$(-28,224.0)
-
MMBtu
$4,155
-
Tgal
$93,000
-
lb
$(-300.0) $(-5,000.0) $173
TOTAL IMPLEMENTED $147,842 $281,275 $27,913
378,720
kWh
$22,901
-
kW-mo/yr
- $4,155
-
Tgal
$93,000
-
lb
$(-300.0) - $173
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings