| Assessment Year | 2023 |
|---|---|
| Principal Product | Plastic Parts of Vehicles |
| NAICS | 336390: Other Motor Vehicle Parts Manufacturing |
| SIC | 3714: Motor Vehicle Parts and Accessories |
| Sales Range | $50 M to 100M |
| # of Employees | 130 |
| Plant Area |
276,000
ft2
|
| Annual Production | 398,000
pieces
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Georgia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $1,063,518 | 11,614,598 |
kWh
|
$0.092 | |
| Natural Gas | $22,325 | 1,502 |
MMBtu
|
$14.86 | |
| Waste Disposal Costs | |||||
| Water Usage | $23,020 | 4,604 |
Tgal
|
$5.00 | |
| Water Disposal | $24,171 | 4,604 |
Tgal
|
$5.25 | |
| TOTAL YEARLY COSTS | $1,133,034 | ||||
| RECOMMENDED SAVINGS* | $148,880 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $51,280 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,991 | $5,960 |
$8,991
97,730
kWh
|
- | |
| 02 | 2.4226: Use / purchase optimum sized compressor | $33,086 | $235,752 |
$33,086
359,631
kWh
|
- | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,175 | $24,588 |
$3,927
42,682
kWh
|
$1,248 | |
| 04 | 2.7135: Install occupancy sensors | $4,028 | $6,350 |
$3,387
36,816
kWh
|
$641 | |
| 05 | 2.7212: Install or upgrade insulation on hvac distribution systems | $545 | $1,958 |
$545
5,926
kWh
|
- | |
| 06 | 2.2622: Replace existing chiller with high efficiency model | $39,181 | $254,691 |
$39,181
425,880
kWh
|
- | |
| 07 | 2.9114: Use solar heat to make electricty | $57,874 | $421,464 |
$57,874
629,065
kWh
|
- | |
| TOTAL RECOMMENDED | $148,880 | $950,763 |
$146,991
1,597,730
kWh
|
$1,889 | ||
| TOTAL IMPLEMENTED | $51,280 | $272,650 |
$49,391
536,859
kWh
|
$1,889 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs