Assessment Year | 2023 |
---|---|
Principal Product | Plastic Parts of Vehicles |
NAICS | 336390: Other Motor Vehicle Parts Manufacturing |
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $50 M to 100M |
# of Employees | 130 |
Plant Area |
276,000
ft2
|
Annual Production | 398,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $1,063,518 | 11,614,598 |
kWh
|
$0.092 | |
Natural Gas | $22,325 | 1,502 |
MMBtu
|
$14.86 | |
Waste Disposal Costs | |||||
Water Usage | $23,020 | 4,604 |
Tgal
|
$5.00 | |
Water Disposal | $24,171 | 4,604 |
Tgal
|
$5.25 | |
TOTAL YEARLY COSTS | $1,133,034 | ||||
RECOMMENDED SAVINGS* | $148,880 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $51,280 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,991 | $5,960 |
$8,991
97,730
kWh
|
- | |
02 | 2.4226: Use / purchase optimum sized compressor | $33,086 | $235,752 |
$33,086
359,631
kWh
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,175 | $24,588 |
$3,927
42,682
kWh
|
$1,248 | |
04 | 2.7135: Install occupancy sensors | $4,028 | $6,350 |
$3,387
36,816
kWh
|
$641 | |
05 | 2.7212: Install or upgrade insulation on hvac distribution systems | $545 | $1,958 |
$545
5,926
kWh
|
- | |
06 | 2.2622: Replace existing chiller with high efficiency model | $39,181 | $254,691 |
$39,181
425,880
kWh
|
- | |
07 | 2.9114: Use solar heat to make electricty | $57,874 | $421,464 |
$57,874
629,065
kWh
|
- | |
TOTAL RECOMMENDED | $148,880 | $950,763 |
$146,991
1,597,730
kWh
|
$1,889 | ||
TOTAL IMPLEMENTED | $51,280 | $272,650 |
$49,391
536,859
kWh
|
$1,889 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs