Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

620

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Office furniture (including fixtures) manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UU0156 #06 Y:2019 Insulate bare equipment $3,874 $3,125
UU0156 #05 Y:2019 Shift from daytime to nighttime operation $1,315 $2,600
UU0156 #04 Y:2019 Use adjustable frequency drive or multiple speed motors on existing system $2,497 $2,300
UU0156 #03 Y:2019 Use / purchase optimum sized compressor $4,768 $12,634
UU0156 #02 Y:2019 Reduce the pressure of compressed air to the minimum required $1,961 $2,600
UU0156 #01 Y:2019 Eliminate leaks in inert gas and compressed air lines/ valves $2,712 $2,024
IC0213 #04 Y:2019 Reduce the pressure of compressed air to the minimum required $1,122 $145
IC0213 #03 Y:2019 Upgrade controls on compressors $2,641 $1,928
IC0213 #02 Y:2019 Use waste heat from hot flue gases to preheat $12,245 $9,440
IC0213 #01 Y:2019 Use most efficient type of electric motors $13,793 $36,662
CL1809 #03 Y:2018 Utilize energy-efficient belts and other improved mechanisms $1,401 $900
CL1809 #02 Y:2018 Utilize higher efficiency lamps and/or ballasts $11,602 $11,662
CL1809 #01 Y:2018 Reduce space conditioning during non-working hours $21,846 $250
SF0521 #08 Y:2018 Use solar heat to make electricty $94,006 $487,058
SF0521 #07 Y:2018 Use adjustable frequency drive or multiple speed motors on existing system $28,263 $61,175
SF0521 #06 Y:2018 Use adjustable frequency drive or multiple speed motors on existing system $23,634 $44,294
SF0521 #05 Y:2018 Utilize higher efficiency lamps and/or ballasts $12,270 $22,190
SF0521 #04 Y:2018 Utilize controls to operate equipment only when needed $2,084 $2,146
SF0521 #03 Y:2018 Reduce the pressure of compressed air to the minimum required $4,444 $3,798
SF0521 #02 Y:2018 Utilize energy-efficient belts and other improved mechanisms $130 $44