ITAC Assessment: UU0156
ITAC logo
ITAC Assessment: UU0156
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Architectural Woodwork
NAICS 337212: Custom Architectural Woodwork and Millwork Manufacturing
SIC 2435: Hardwood Veneer and Plywood
Sales Range $50
M
to 100
M
# of Employees 196
Plant Area 130,000
ft2
Annual Production 50,000,000
units
Production Hrs. Annual 4,800
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $100,212 2,737,800
kWh
Electricity Demand $160,944 9,764
kW-mo/yr
Electricity Fees $45,379 -
Natural Gas $17,229 13,833
MMBtu
Waste Disposal Costs
Water Usage $16,564 4,070
Tgal
Solid Waste (non-haz) $29,120 782,000
lb
TOTAL YEARLY COSTS $369,447
RECOMMENDED SAVINGS* $17,126 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,082

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,712 $2,024 $1,410
38,532
kWh
$1,301
-
kW-mo/yr
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,961 $2,600 $922
25,200
kWh
$1,038
-
kW-mo/yr
-
03 2.4226: Use / purchase optimum sized compressor $4,768 $12,634 $4,132
112,896
kWh
$636
-
kW-mo/yr
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,497 $2,300 $867
23,682
kWh
$1,630
-
kW-mo/yr
-
05 2.3134: Shift from daytime to nighttime operation $1,315 $2,600 - $1,315
-
kW-mo/yr
-
06 2.2511: Insulate bare equipment $3,874 $3,125 - - $3,874
-
MMBtu
TOTAL RECOMMENDED $17,126 $25,283 $7,331
200,310
kWh
$5,920
-
kW-mo/yr
$3,874
-
MMBtu
TOTAL IMPLEMENTED $9,082 $7,449 $2,277
62,214
kWh
$2,931
-
kW-mo/yr
$3,874
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs