ITAC Assessment: IC0213
ITAC logo
ITAC Assessment: IC0213
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Drawer Slides, Shelving Brackets/Pilasters
NAICS 337215: Showcase, Partition, Shelving, and Locker Manufacturing
SIC 3429: Hardware, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 500
Plant Area 418,000
ft2
Annual Production 10,000,000
units
Production Hrs. Annual 6,257
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $793,033 9,912,909
kWh
Electricity Demand $137,491 32,736
kW-mo/yr
Natural Gas $279,598 62,715
MMBtu
Waste Disposal Costs
Water Usage $77,056 27,167
Tgal
Water Disposal $129,326 27,167
Tgal
TOTAL YEARLY COSTS $1,416,504
RECOMMENDED SAVINGS* $29,801 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,367

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $13,793 $36,662 $11,978
149,730
kWh
$1,814
-
kW-mo/yr
-
02 2.2414: Use waste heat from hot flue gases to preheat $12,245 $9,440 - - $12,245
-
MMBtu
03 2.4224: Upgrade controls on compressors $2,641 $1,928 $1,919
23,972
kWh
$722
-
kW-mo/yr
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,122 $145 $727
9,086
kWh
$395
-
kW-mo/yr
-
TOTAL RECOMMENDED $29,801 $48,175 $14,624
182,788
kWh
$2,932
-
kW-mo/yr
$12,245
-
MMBtu
TOTAL IMPLEMENTED $13,367 $9,585 $727
9,086
kWh
$395
-
kW-mo/yr
$12,245
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs