| Assessment Year | 2019 |
|---|---|
| Principal Product | Drawer Slides, Shelving Brackets/Pilasters |
| NAICS | 337215: Showcase, Partition, Shelving, and Locker Manufacturing |
| SIC | 3429: Hardware, Not Elsewhere Classified |
| Sales Range | $100 M to 500M |
| # of Employees | 500 |
| Plant Area |
418,000
ft2
|
| Annual Production | 10,000,000
units
|
| Production Hrs. Annual | 6,257
hrs
|
| Location (State) | Michigan |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $793,033 | 9,912,909 |
kWh
|
$0.080 | |
| Electricity Demand | $137,491 | 32,736 |
kW-mo/yr
|
$4.20 | |
| Natural Gas | $279,598 | 62,715 |
MMBtu
|
$4.46 | |
| Waste Disposal Costs | |||||
| Water Usage | $77,056 | 27,167 |
Tgal
|
$2.84 | |
| Water Disposal | $129,326 | 27,167 |
Tgal
|
$4.76 | |
| TOTAL YEARLY COSTS | $1,416,504 | ||||
| RECOMMENDED SAVINGS* | $29,801 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $13,367 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4133: Use most efficient type of electric motors | $13,793 | $36,662 |
$11,978
149,730
kWh
|
$1,814
-
kW-mo/yr
|
- | |
| 02 | 2.2414: Use waste heat from hot flue gases to preheat | $12,245 | $9,440 | - | - |
$12,245
-
MMBtu
|
|
| 03 | 2.4224: Upgrade controls on compressors | $2,641 | $1,928 |
$1,919
23,972
kWh
|
$722
-
kW-mo/yr
|
- | |
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,122 | $145 |
$727
9,086
kWh
|
$395
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $29,801 | $48,175 |
$14,624
182,788
kWh
|
$2,932
-
kW-mo/yr
|
$12,245
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $13,367 | $9,585 |
$727
9,086
kWh
|
$395
-
kW-mo/yr
|
$12,245
-
MMBtu
|
||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs