Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

620

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Office furniture (including fixtures) manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MS0465 #07 Y:2026 Apply for tax-free status for energy purchases $7,003 -
MS0465 #06 Y:2026 Clean or color roof to reduce solar load $4,092 $42,669
MS0465 #05 Y:2026 Lower temperature during the winter season and vice-versa $4,474 -
MS0465 #04 Y:2026 Reschedule and rearrange multiple-source heating systems $14,437 -
MS0465 #03 Y:2026 Keep doors and windows shut when not on use $39,664 $104,260
MS0465 #02 Y:2026 Purchase new equipment to reduce material use / cost $398 $1,280
MS0465 #01 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $408 $2,243
UC2517 #08 Y:2025 Utilize controls to operate equipment only when needed $1,679 $75
UC2517 #07 Y:2025 Replace existing hvac unit with high efficiency model $47,694 $234,000
UC2517 #06 Y:2025 Eliminate or reduce compressed air usage $99 -
UC2517 #05 Y:2025 Install compressor air intakes in coolest locations $613 $950
UC2517 #04 Y:2025 Reduce the pressure of compressed air to the minimum required $3,387 -
UC2517 #03 Y:2025 Use or replace with energy efficient substitutes $4,211 $30,300
UC2517 #02 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $1,638 $340
UC2517 #01 Y:2025 Change rate schedules or other changes in utility service $17,808 -
SU0578 #18 Y:2025 Use cooling tower or economizer to replace chiller cooling $4,025 $15,784
SU0578 #17 Y:2025 Install / repair insulation on steam lines $1,185 $2,822
SU0578 #16 Y:2025 Install occupancy sensors $574 $1,355
SU0578 #15 Y:2025 Conserve energy by efficient use of vending machines $350 $745
SU0578 #14 Y:2025 Use or replace with energy efficient substitutes $1,331 $2,080