Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

564

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Office furniture (including fixtures) manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WM0232 #05 Y:2024 Install occupancy sensors $778 $800
WM0232 #04 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $1,332 $2,750
WM0232 #03 Y:2024 Reduce space conditioning during non-working hours $3,500 $360
WM0232 #02 Y:2024 Utilize higher efficiency lamps and/or ballasts $5,625 $22,658
WM0232 #01 Y:2024 Use / purchase optimum sized compressor $11,149 $46,220
DL0246 #06 Y:2024 Turn off equipment during breaks, reduce operating time $12,745 $18,000
DL0246 #05 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $13,359 $16,560
DL0246 #04 Y:2024 Recycle air for heating, ventilation and air conditioning $65,735 $420,000
DL0246 #03 Y:2024 Recover waste heat from equipment $8,062 $21,900
DL0246 #02 Y:2024 Insulate bare equipment $1,262 $8,600
DL0246 #01 Y:2024 Utilize higher efficiency lamps and/or ballasts $41,655 $181,095
GT0984 #09 Y:2024 Use solar heat to make electricty $48,984 $1,053,552
GT0984 #08 Y:2024 Install occupancy sensors $2,912 $7,675
GT0984 #07 Y:2024 Turn off equipment when not in use $775 $1,950
GT0984 #06 Y:2024 Utilize higher efficiency lamps and/or ballasts $2,806 $6,230
GT0984 #05 Y:2024 Conserve energy by efficient use of vending machines $219 $225
GT0984 #04 Y:2024 Reduce space conditioning during non-working hours $1,676 $1,650
GT0984 #03 Y:2024 Eliminate or reduce compressed air usage $7,669 $3,750
GT0984 #02 Y:2024 Reduce the pressure of compressed air to the minimum required $875 $400
GT0984 #01 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $9,281 $1,850