Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Household furniture (except wood and metal) manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IC0344 #10 Y:2026 Keep doors and windows shut when not on use $16 -
IC0344 #09 Y:2026 Use or replace with energy efficient substitutes $13,246 $50,000
IC0344 #08 Y:2026 Use waste heat from hot flue gases to preheat incoming fluids $2,895 $20,600
IC0344 #07 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $319 $548
IC0344 #06 Y:2026 Install / repair insulation on steam lines $954 $1,353
IC0344 #05 Y:2026 Insulate feedwater tank $551 $660
IC0344 #04 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $2,531 $1,604
IC0344 #03 Y:2026 Upgrade controls on compressors $12,669 $3,021
IC0344 #02 Y:2026 Use battery storage for demand control $23,871 $30,729
IC0344 #01 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $348 -
IP0009 #06 Y:2012 Replace electrically-operated equipment with fossil fuel equipment $4,547 $15,000
IP0009 #05 Y:2012 Repair furnaces and oven doors so that they seal efficiently $5,706 $12,000
IP0009 #04 Y:2012 Utilize higher efficiency lamps and/or ballasts $15,967 $25,082
IP0009 #03 Y:2012 Size electric motors for peak operating efficiency $4,258 $5,693
IP0009 #02 Y:2012 Use or replace with energy efficient substitutes $12,003 $920
IP0009 #01 Y:2012 Eliminate leaks in inert gas and compressed air lines/ valves $11,407 -
GT0787 #07 Y:2004 Recover waste heat from equipment $6,608 $5,050
GT0787 #06 Y:2004 Change rate schedules or other changes in utility service $19,300 $1,000
GT0787 #05 Y:2004 Combine utility meters $12,229 $2,000
GT0787 #04 Y:2004 Reduce space conditioning during non-working hours $655 -